Chokecherry And Sierra Madre Wind Energy Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Chokecherry (Phases 1A, 1B, 2A), Sierra Madre (Phases 1C, 2B)
Chokecherry And Sierra Madre Wind Energy Project is a wind farm under construction in Carbon County, Wyoming, United States.
Project Details
Table 1: Phase-level project details for Chokecherry And Sierra Madre Wind Energy Project
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1A | Construction[1] | 2029 (planned)[2] | 893 MW[2] | Onshore[1] | Power Company of Wyoming LLC [100%][3] |
1B | Construction[1] | 2029 (planned)[2] | 886 MW[2] | Onshore[1] | Power Company of Wyoming LLC [100%][3] |
1C | Cancelled[2] | – | 500 MW[1] | Onshore[1] | Power Company of Wyoming LLC [100%][3] |
2A | Construction[1] | 2030 (planned)[2] | 980 MW[2] | Onshore[1] | Power Company of Wyoming LLC [100%][3] |
2B | Construction[1] | 2031 (planned)[2] | 792 MW[2] | Onshore[1] | Power Company of Wyoming LLC [100%][3] |
Location
Table 2: Phase-level location details for Chokecherry And Sierra Madre Wind Energy Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1A | Carbon County, Wyoming, United States[1] | 41.6831, -107.2001 (exact)[1] |
1B | Carbon County, Wyoming, United States[1] | 41.6831, -107.2001 (exact)[1] |
1C | Carbon County, Wyoming, United States[1] | 41.6831, -107.2001 (exact)[1] |
2A | Carbon County, Wyoming, United States[1] | 41.6831, -107.2001 (exact)[1] |
2B | Carbon County, Wyoming, United States[1] | 41.6831, -107.2001 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240131092910/https://www.powercompanyofwyoming.com/about/company.shtml. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)