Chollet hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Chollet hydroelectric plant is a shelved hydroelectric power plant in Moloundou, Boumba-et-Ngoko, East Province, Cameroon.

Project Details

Table 1: Project details for Chollet hydroelectric plant

Status Nameplate capacity
Shelved[1] 600 MW[2]

Location

Table 2: Location details for Chollet hydroelectric plant

Location River Coordinates (WGS 84)
Moloundou, Moloundou, Boumba-et-Ngoko, East Province, Cameroon[3] Dja River[2] 1.9508, 15.6013 (approximate)[3]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20230610120838/https://www.businessincameroon.com/energy/0111-12826-cameroon-french-tpf-exits-the-chollet-dam-project-another-delay-in-sight. Archived from the original on 10 June 2023. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20220921210815/https://www.afrik21.africa/en/cameroon-congo-chinas-cggc-wins-the-construction-of-the-chollet-dam-600-mw/. Archived from the original on 21 September 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20220921212427/https://www.globaldata.com/store/report/moedrc-goc-chollet-hydroelectric-power-plant-project-600-mw-republic-of-congo/. Archived from the original on 21 September 2022. {{cite web}}: Missing or empty |title= (help)