Chotia Coal Mine
This article is part of the Global Coal Mine Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Related-articles: |
Chotia Coal Mine is an operating coal mine in Salaigot, Korba, Chhattisgarh, India.
Location
Table 1: Project-level location details
Mine Name | Location | Coordinates (WGS 84) |
---|---|---|
Chotia Coal Mine | Salaigot, Korba, Chhattisgarh, India | 22.780896, 82.476655 (exact) |
The map below shows the exact location of the coal mine:
Project Details
Table 2: Project status
Status | Status Detail | Opening Year | Closing Year |
---|---|---|---|
Operating | – | – | – |
Table 3: Operation details
Capacity (Mtpa) | Production (Mtpa) | Year of Production | Mine Type | Mining Method | Mine Size (km2) | Mine Depth (m) | Workforce Size |
---|---|---|---|---|---|---|---|
1[1][2] | 1 | 2020 | Surface | Open Pit | 11.79 | 50* | 498* |
Table 4: Coal resources and destination
Total Reserves (Mt) | Year of Total Reserves Recorded | Total Resources (Mt) | Coalfield | Coal Type | Coal Grade | Primary Consumer/ Destination |
---|---|---|---|---|---|---|
11 | – | 14 | Hasdeo Arand | Subbituminous | Thermal | – |
Table 5: Ownership and parent company
Owner | Parent Company | Headquarters |
---|---|---|
Bharat Aluminium Company Ltd[3] | Vedanta Ltd [51.0%]; Government of India [49.0%] | India |
Table 6: Historical production (unit: million tonnes per annum)
ROM or Saleable | 2017 | 2018 | 2019 | 2020 | 2021 | 2022 | 2023 |
---|---|---|---|---|---|---|---|
ROM | – | 0[4] | 1[4] | 0[4] | – | – | 1[5] |
Note: The above section was automatically generated and is based on data from the Global Coal Mine Tracker April 2024 release and the September supplement.
Background on Mine
The Chotia coal mine has a designed capacity of 1 million tonne-per-annum capacity on a mining lease area of 1179.826 Ha.
This block was earlier allocated to Prakash Industries Limited (PIL) which secured the environment clearance for 1 MTPA rpdocution of Chotia-I on 10 November 2015.[6] However, in the wake of coalgate scandal Supreme Court of India, cancelled all allocated coal blocks in Aug 2014. Post cancellation, Govt of India promulgated "Coal Mines (Special Provision) Ordinance" and coal blocks were auction through a electronic bidding process. BALCO won this mine in that bidding process and the said mine was handed over with the existing infrastructure to Balco after making the required payment.[7]
The Chotia coal mines consists of two sub blocks namely Chotia I and Chotia II having mining lease area of 863.00 Ha and 316.826 Ha respectively with a common lease area of 1179.826 Ha. As per the "Coal Mine Development Agreement" (CMDPA), signed between BALCO and Ministry of Coal, BALCO has to annually produce 1 MTPA coal from Chotia.
The first Mining Plan prepared by PIL was approved by MoC in 2004 vide no. 13016/22/2003-CA dated 04.08.2004 and thereafter opencast operation was started in 2006. Subsequently, PIL conducted further exploration in two phases and based on the outcome, the GR was revised and accordingly Mining Plan was revised two times and approved by Ministry of Coal vide reference nos. 13016/22/2003-CA-1 and 13016/22/2003-CA-1 (Vol-III). The 2nd and the last revision of Mining Plan stipulated a peak production capacity of 1Mtpa coal.
The mine has been operational since 2006 and has been producing 1 MTPA from Chotia I. The open castable reserve of Chotia I has almost exhausted. To maintain the existing production level of 1 MTPA from the mine, the change in environmental clearance is envisaged. The Chotia coal mine which consist of Chotia I & II sub block is allocated for use of coal at BALCO's 600 MW Captive Power Plant at Korba District to meet its power requirement for manufacturing of Aluminium products.[8]
Articles and Resources
Additional data
To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20240122200617/https://d2z1l9uefzbzxd.cloudfront.net/wp-content/uploads/2022/04/13.-EC-Chotia-1.pdf. Archived from the original (PDF) on 22 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240122200651/https://d2z1l9uefzbzxd.cloudfront.net/wp-content/uploads/2022/04/14.-NEW-EC-Cotia-II-06.05.2019.pdf. Archived from the original (PDF) on 22 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240723003314/https://economictimes.indiatimes.com/industry/indl-goods/svs/metals-mining/vedanta-groups-balco-inaugurates-new-coal-mine/articleshow/49702474.cms?from=mdr. Archived from the original on 23 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 (PDF) https://coal.gov.in/sites/default/files/2021-06/Provisional-Coal-Statistics-2020-21_0.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240716152817/https://coal.gov.in/sites/default/files/2023-06/MoM08042024.pdf. Archived from the original (PDF) on 16 July 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ Environment Clearance for Chotia-I, MoEF&CC India, 10 November, 2005
- ↑ Balco wins the coal block Chotia in Chhattisgarh in Tuesday’s auction, 18 February 2015, site accessed on 10 April, 2020
- ↑ Cite error: Invalid
<ref>
tag; no text was provided for refs namedEC