Chulmanskaya power station (Чульманская ТЭЦ) is a 48-megawatt (MW) coal-fired power plant in Sakha Republic, Russia.

Location

The undated satellite photo below shows the plant.

Loading map...

Background on Plant

The 48-MW Chulmanskaya power station is owned by Far Eastern Generating Company, which in turn is owned by RusHydro.

The plant's four 12MW units went online in between 1970-1978.[1]

Planned retirement

In May 2021, it was reported that when the expansion of Neryungrinskaya power station comes online, the Chulmanskaya power plant will be decommissioned.[2][3] The heating needs for the settlement of Chulman will be covered by a new gas-fired boiler.[2]

The government decree from February 2022 lists units 3,5, and 6 for planned retirement already by 2023, ahead of the planned commissioning of the new units at Neryingrinskaya in 2025.[4] This would leave only 12MW of available capacity at Chulmanskaya power station.

The plant generated 100 million kWh of electricity in 2020.[5]

Plant Details

  • Owner: Far Eastern Generating Company
  • Parent company: RusHydro
  • Location: Chulman, Sakha Republic, Russia
  • Coordinates: 56.85139490563535, 124.90911449908783 (exact)
  • Status: Operating
  • Gross capacity: 48MW[1][5]
    • Unit 3: 12MW[1] (planned retirement in 2023)[4]
    • Unit 5: 12MW[1] (planned retirement in 2023)[4]
    • Unit 6: 12MW[1] (planned retirement in 2023)[4]
    • Unit 7: 12MW[1]
  • Type: Subcritical
  • In service: 1970-1978[1]
  • Coal type: Bituminous
  • Coal source: mines of Neryungri Deposit[1]
  • Source of financing:

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Чульманская ТЭЦ". Wikipedia. Retrieved November 2022. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  2. 2.0 2.1 "Изношенную Чульманскую ТЭЦ заменит современная экологичная котельная". ruscable.ru. May 13, 2021. Retrieved Jun 16, 2022.
  3. The heads of RusHydro and the Republic of Sakha (Yakutia) discussed the development of the regional electric power industry, EP Russia, May 20, 2021
  4. 4.0 4.1 4.2 4.3 "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". garant.ru. May 2022.{{cite web}}: CS1 maint: url-status (link)
  5. 5.0 5.1 Far Eastern Generating Company. "2020 Annual Report". Retrieved November 2022 via the Wayback Machine. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)

Related GEM.wiki articles

External resources