Chuzhou Natural Gas Peaking power station (滁州天然气调峰电厂) is an operating power station of at least 900-megawatts (MW) in Chuzhou, Tianchang City, Shiliang, Anhui, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Chuzhou Natural Gas Peaking power station | Chuzhou, Tianchang City, Shiliang, Anhui, China | 32.690915, 118.878849 (approximate)[1] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
1 | Operating[2] | fossil gas: LNG[1] | 450[1] | combined cycle[1] | not found | 2024[2] |
2 | Operating[3] | fossil gas: LNG[1] | 450[1] | combined cycle[1] | not found | 2024 (planned)[4] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
1 | Huaihe Energy Holding Group Co Ltd [100%][1][5] | Huaihe Energy Holding Group Co Ltd [100.0%] |
2 | Huaihe Energy Holding Group Co Ltd [100%][1][5] | Huaihe Energy Holding Group Co Ltd [100.0%] |
Background
- Chuzhou Natural Gas Peaking power station Project, which underwent public notice and approval in November 2021, is the first natural gas peak regulation power plant project in Anhui Province to be assigned a project code. The project is located in the Shiliang Town Industrial Park of Tianchang City, Chuzhou, with an investment of approximately 2.37 billion RMB. The construction scale includes two 450MW-class 9F gas-steam combined cycle units, with the main source of gas supply being the Suzhong-Anhui Gas Pipeline associated with the Jiangsu Binhai LNG receiving terminal.[6]
- On May 29, 2022, the project officially commenced construction.[7]
- It was reported that Unit #1 successfully received factory power supply in July 2023, marking the official entry of the project into the sub-system commissioning and testing phase, with the goal of putting this unit into operation by the end of 2023.[8]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://web.archive.org/web/20220708183857/https://www.china5e.com/news/news-1127796-1.html. Archived from the original on 08 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 http://www.hhnykg.com/articles/1104/114919.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240705175315/https://m.bjx.com.cn/mnews/20240506/1375162.shtml. Archived from the original on 05 July 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://m.bjx.com.cn/mnews/20240318/1366661.shtml.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.qcc.com/firm/b7a10f357786c7b152cf5b557af7c37a.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "滁州天然气调峰电厂项目正式启动". 2021-12-29. Retrieved 2023-10-10.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "淮河能源集团滁州天然气调峰电厂项目主厂房第一罐混凝土浇筑仪式". 2022-05-30. Retrieved 2023-10-10.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "滁州天然气调峰电厂项目倒送电一次成功". 2023-07-31. Retrieved 2023-10-10.
{{cite web}}
: CS1 maint: url-status (link)
Additional data