Chuzhou Natural Gas Peaking power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Chuzhou Natural Gas Peaking power station (滁州天然气调峰电厂) is an operating power station of at least 900-megawatts (MW) in Chuzhou, Tianchang City, Shiliang, Anhui, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Chuzhou Natural Gas Peaking power station Chuzhou, Tianchang City, Shiliang, Anhui, China 32.690915, 118.878849 (approximate)[1]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[2] fossil gas - LNG[1] 450[1] combined cycle[1] 2024[2]
Unit 2 operating[3] fossil gas - LNG[1] 450[1] combined cycle[1] 2024[3]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Huaihe Energy Holding Group Co Ltd [100.0%]
Unit 2 Huaihe Energy Holding Group Co Ltd [100.0%]

Background

  • Chuzhou Natural Gas Peaking power station Project, which underwent public notice and approval in November 2021, is the first natural gas peak regulation power plant project in Anhui Province to be assigned a project code. The project is located in the Shiliang Town Industrial Park of Tianchang City, Chuzhou, with an investment of approximately 2.37 billion RMB. The construction scale includes two 450MW-class 9F gas-steam combined cycle units, with the main source of gas supply being the Suzhong-Anhui Gas Pipeline associated with the Jiangsu Binhai LNG receiving terminal.[4]
  • On May 29, 2022, the project officially commenced construction.[5]
  • It was reported that Unit #1 successfully received factory power supply in July 2023, marking the official entry of the project into the sub-system commissioning and testing phase, with the goal of putting this unit into operation by the end of 2023.[6]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20220708183857/https://www.china5e.com/news/news-1127796-1.html. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 "滁州天然气调峰电厂一号机组正式投产发电". www.hhnykg.com. Retrieved 2024-03-27.
  3. 3.0 3.1 "滁州天然气调峰电厂2号燃机点火一次成功-北极星电力新闻网". m.bjx.com.cn. 2024-01-05. Retrieved 2024-03-27.
  4. "滁州天然气调峰电厂项目正式启动". 2021-12-29. Retrieved 2023-10-10.{{cite web}}: CS1 maint: url-status (link)
  5. "淮河能源集团滁州天然气调峰电厂项目主厂房第一罐混凝土浇筑仪式". 2022-05-30. Retrieved 2023-10-10.{{cite web}}: CS1 maint: url-status (link)
  6. "滁州天然气调峰电厂项目倒送电一次成功". 2023-07-31. Retrieved 2023-10-10.{{cite web}}: CS1 maint: url-status (link)