Ciro Redondo power station (Planta de biomasa Ciro Redondo) is an operating power station of at least 60-megawatts (MW) in Ciro Redondo, Ciego de Ávila, Cuba.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Ciro Redondo power station | Ciro Redondo, Ciego de Ávila, Cuba | 22.0091, -78.7052 (exact)[1] |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- 1: 22.0091, -78.7052
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Start year |
---|---|---|---|---|
1 | Operating[2][3][4] | bioenergy: wood & other biomass (solids), bioenergy: agricultural waste (solids)[2][5] | 60[6][7][5] | 2021[4] |
Table 3: Unit-level ownership and operator details
Unit name | Operator | Owner | Parent |
---|---|---|---|
1 | Biopower[5][2][6][4] | Biopower SA [100%][5][2][6][4] | Zerus SA [51.0%]; Havana Energy Ltd [49.0%] |
Articles and Resources
References
- ↑ https://web.archive.org/web/20221206221440/https://www.google.com/maps/place/Bioelectrica/@22.0091367,-78.70633,335m/data=!3m2!1e3!4b1!4m5!3m4!1s0x8ed5278c75079d9d:0x4403f403c477b88e!8m2!3d22.0091355!4d-78.7052088?shorturl=1. Archived from the original on 06 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20221207175912/https://cubasi.cu/en/news/cubas-first-bioelectric-plant-synchronized-national-power-grid. Archived from the original on 07 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230315093906/http://www.cubadebate.cu/noticias/2022/07/05/sincroniza-al-sistema-electrico-nacional-y-funciona-de-forma-estable-primera-bioelectrica-cubana/. Archived from the original on 15 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 https://web.archive.org/web/20220927164245/https://www.granma.cu/cuba/2021-12-19/exitosa-prueba-de-sincronizacion-entre-la-bioelectrica-y-el-central-ciro-redondo. Archived from the original on 27 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 5.2 5.3 https://web.archive.org/web/20220916160407/https://www.argusmedia.com/en/news/2120771-cuba-launches-first-biomass-power-plant. Archived from the original on 16 September 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 https://web.archive.org/web/20221207175634/http://www.acn.cu/economia/88835-califican-de-positivo-aporte-al-sen-de-bioelectrica-en-fase-de-pruebas. Archived from the original on 07 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230331131559/https://diariodecuba.com/cuba/1577483407_8386.html. Archived from the original on 31 March 2023.
{{cite web}}
: Missing or empty|title=
(help)
Additional data
To access additional data, including an interactive map of bioenergy power stations, a downloadable dataset, and summary data, please visit the Global Bioenergy Power Tracker on the Global Energy Monitor website.