Claresholm Solar

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Claresholm Solar is an operating solar photovoltaic (PV) farm in Municipal District of Willow Creek, Alberta, Canada.

Project Details

Table 1: Phase-level project details for Claresholm Solar

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2021[1] 132 MWac[1] PV[2] Obton AS [49%]; Capstone [51%][3][3] Capstone[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Claresholm Solar

Location Coordinates (WGS 84)
Municipal District of Willow Creek, Alberta, Canada[1] 50.0309, -113.481 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240201154608/https://www.capstoneinfrastructure.com/our-businesses/operating-facilities/claresholm. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240207115952/https://pvbuzz.com/top-five-largest-solar-installations-canada/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240201154548/https://www.capstoneinfrastructure.com/our-businesses/operating-facilities/AmherstburgSolarPark. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)