Clearwater wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Clearwater wind farm is an operating wind farm in Rock Springs, Rosebud County, Montana, United States.

Project Details

Table 1: Phase-level project details for Clearwater wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2022[1] 365 MW[2] Onshore[3] NextEra Energy Inc; Portland General Electric Co[4] NextEra Energy[2]
2 Operating[5] 2023[5] 103 MW[3] Onshore[3] NextEra Energy Inc; Portland General Electric Co[4] NextEra Energy[6]
3 Operating[7] 2024[7] 100 MW[5] Onshore[5] NextEra Energy Inc[8]
East Operating[5] 2024[5] 208 MW[3] Onshore[3] NextEra Energy Inc; Portland General Electric Co[4] NextEra Energy[6]

Location

Table 2: Phase-level location details for Clearwater wind farm

Phase Name Location Coordinates (WGS 84)
1 Rock Springs, Rosebud County, Montana, United States[5] 46.8177, -106.3789 (exact)[5]
2 Rosebud County, United States[5] 46.8188, -106.1946 (exact)[5]
3 Rosebud County, Montana, United States[5] 46.8188, -106.1946 (exact)[5]
East Custer County, United States[5] 46.7896, -106.0021 (exact)[5]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240126122926/https://dkengin.com/projects/clearwater-wind-farm/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240125175251/https://www.nexteraenergyresources.com/clearwater-wind/project-overview.html. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  4. 4.0 4.1 4.2 https://dkengin.com/projects/clearwater-wind-farm/ https://dkengin.com/projects/clearwater-wind-farm/, https://dkengin.com/projects/clearwater-wind-farm/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  6. 6.0 6.1 https://web.archive.org/web/20240126160448/https://portlandgeneral.com/news/2022-10-25-pge-procures-311-megawatts-from-clearwater-wind-project-in-montana. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  8. https://www.nexteraenergyresources.com/clearwater-wind.html. {{cite web}}: Missing or empty |title= (help)