Clearwater wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Clearwater wind farm is an operating wind farm in Rock Springs, Rosebud County, Montana, United States.
Project Details
Table 1: Phase-level project details for Clearwater wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2022[1] | 365 MW[2] | Onshore[3] | NextEra Energy Inc; Portland General Electric Co[4] | NextEra Energy[2] |
2 | Operating[5] | 2023[5] | 103 MW[3] | Onshore[3] | NextEra Energy Inc; Portland General Electric Co[4] | NextEra Energy[6] |
3 | Operating[7] | 2024[7] | 100 MW[5] | Onshore[5] | NextEra Energy Inc[8] | – |
East | Operating[5] | 2024[5] | 208 MW[3] | Onshore[3] | NextEra Energy Inc; Portland General Electric Co[4] | NextEra Energy[6] |
Location
Table 2: Phase-level location details for Clearwater wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Rock Springs, Rosebud County, Montana, United States[5] | 46.8177, -106.3789 (exact)[5] |
2 | Rosebud County, United States[5] | 46.8188, -106.1946 (exact)[5] |
3 | Rosebud County, Montana, United States[5] | 46.8188, -106.1946 (exact)[5] |
East | Custer County, United States[5] | 46.7896, -106.0021 (exact)[5] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240126122926/https://dkengin.com/projects/clearwater-wind-farm/. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240125175251/https://www.nexteraenergyresources.com/clearwater-wind/project-overview.html. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 4.0 4.1 4.2 https://dkengin.com/projects/clearwater-wind-farm/ https://dkengin.com/projects/clearwater-wind-farm/, https://dkengin.com/projects/clearwater-wind-farm/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 5.13 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 6.0 6.1 https://web.archive.org/web/20240126160448/https://portlandgeneral.com/news/2022-10-25-pge-procures-311-megawatts-from-clearwater-wind-project-in-montana. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860m/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://www.nexteraenergyresources.com/clearwater-wind.html.
{{cite web}}
: Missing or empty|title=
(help)