Clinch River SMR nuclear power plant

From Global Energy Monitor
Part of the
Global Nuclear Power Tracker,
a Global Energy Monitor project.
Report an error

Clinch River SMR nuclear power plant is a nuclear power plant in pre-construction in Oak Ridge, Roane County, Tennessee, United States.

Project Details

Table 1: Unit-level project details for Clinch River SMR nuclear power plant

Unit name Status Commissioning year Nameplate capacity Reactor type Model Owner Operator
1 Pre-construction[1][2] 2032 (planned)[1] 180 MW[3] Boiling water reactor[4] BWRX-300[1] Tennessee Valley Authority [100%][1] Tennessee Valley Authority[1]

Table 2: Additional unit-level timeline details for Clinch River SMR nuclear power plant

Unit name Commercial operation
1 2032[1]

Location

Table 3: Unit-level location details for Clinch River SMR nuclear power plant

Unit name Location Coordinates (WGS 84)
1 Oak Ridge, Roane County, Tennessee, United States[5] 35.88944, -84.3793 (exact)

The map below shows the exact location of the nuclear power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Nuclear Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://web.archive.org/web/20220920140853/https://www.powermag.com/tva-unveils-major-new-nuclear-program-first-smr-at-clinch-river-site/. Archived from the original on 20 September 2022. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240530222011/https://www.tnadvancedenergy.com/tvas-clinch-river-nuclear-project-shaping-the-future-of-clean-and-sustainable-energy/. Archived from the original on 30 May 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20130330123147/http://www.babcock.com/news_and_events/2013/20130220a.html. {{cite web}}: Check |archive-url= value (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20220918180706/https://nuclear.gepower.com/build-a-plant/products/nuclear-power-plants-overview/bwrx-300. Archived from the original on 18 September 2022. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20220809194222/https://www.ans.org/news/article-2602/tva-invites-input-on-clinch-river-plans/. Archived from the original on 09 August 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)