Clogher Head Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Hibernian Wind Power, Clogherhead

Clogher Head Offshore wind farm is a wind farm in pre-construction in Ireland.

Project Details

Table 1: Phase-level project details for Clogher Head Offshore wind farm

Status Commissioning year Nameplate capacity Type Owner Operator
Pre-construction[1] 2027 (planned)[2] 800 MW[1] Offshore hard mount[3] ESB Group [75%]; Parkwind NV [25%]; Ørsted A/S[2][2][1] Hibernian Wind Power[2]

Location

Table 2: Phase-level location details for Clogher Head Offshore wind farm

Location Coordinates (WGS 84)
Ireland[4] 53.8201, -6.0401 (approximate)[4]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240423203231/https://www.4coffshore.com/windfarms/ireland/clogherhead-ireland-ie16.html. Archived from the original on 23 April 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240126015406/https://www.power-technology.com/marketdata/clogherhead-ireland/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240126104507/https://www.clogherheadwind.ie/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240131215629/https://www.thewindpower.net/windfarm_en_23070.php. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)