Cloghercor wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Cloghercor wind farm is a wind farm in pre-construction in Fintown, Donegal, Ireland.

Project Details

Table 1: Phase-level project details for Cloghercor wind farm

Status Commissioning year Nameplate capacity Type Owner
Pre-construction[1] 2027 (planned)[2] 125.4 MW[2] Onshore[2] Coillte [50%]; Ørsted A/S [50%][2][2]

Location

Table 2: Phase-level location details for Cloghercor wind farm

Location Coordinates (WGS 84)
Fintown, Donegal, Ireland[2] 54.87093060143962, -8.119812994979762 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240506205733/https://cloghercorwindfarm.com/latest-updates. Archived from the original on 06 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240506205312/https://orsted.ie/renewable-energy-solutions/onshore-wind/onshore-wind-farms. Archived from the original on 06 May 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)