Colorado Green Wind Project
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Colorado Green Wind Project is an operating wind farm in Prowers County, Colorado, United States.
Project Details
Table 1: Phase-level project details for Colorado Green Wind Project
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|---|
1 | Retired[1] | 2003[2] | 2020[1] | 162 MW[3] | Onshore[3] | Avangrid Renewables [100%][4] | PPM Energy; Shell Wind Energy[5] |
RP | Operating[1] | 2020[1] | – | 160 MW[1] | Onshore[1] | Avangrid Renewables [100%][6] | – |
Location
Table 2: Phase-level location details for Colorado Green Wind Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Prowers County, Colorado, United States[3] | 37.7156, -102.6119 (exact)[3] |
RP | United States[1] | 37.7156, -102.6119 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240125152732/https://www.fakeaddress.com/. Archived from the original on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ 3.0 3.1 3.2 3.3 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ https://web.archive.org/web/20240131093025/https://e.infogram.com/_/koS3z7vmIOEmqftYMv2Q?parent_url=https%3A%2F%2Fwww.spglobal.com%2Fmarketintelligence%2Fen%2Fnews-insights%2Fblog%2Fbanking-essentials-january-24th&src=embed. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.thewindpower.net/windfarm_en_2910.php https://www.thewindpower.net/windfarm_en_2910.php, https://www.thewindpower.net/windfarm_en_2910.php.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131093027/https://theprowersjournal.com/2019/12/replacement-process-for-colorado-green-turbines-to-begin/. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help)