Colorado Green Wind Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Colorado Green Wind Project is an operating wind farm in Prowers County, Colorado, United States.

Project Details

Table 1: Phase-level project details for Colorado Green Wind Project

Phase name Status Commissioning year Retired year Nameplate capacity Type Owner Operator
1 Retired[1] 2003[2] 2020[1] 162 MW[3] Onshore[3] Avangrid Renewables [100%][4] PPM Energy; Shell Wind Energy[5]
RP Operating[1] 2020[1] 160 MW[1] Onshore[1] Avangrid Renewables [100%][6]

Location

Table 2: Phase-level location details for Colorado Green Wind Project

Phase Name Location Coordinates (WGS 84)
1 Prowers County, Colorado, United States[3] 37.7156, -102.6119 (exact)[3]
RP United States[1] 37.7156, -102.6119 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://web.archive.org/web/20240125152732/https://www.fakeaddress.com/. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  2. "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  3. 3.0 3.1 3.2 3.3 Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.{{cite web}}: CS1 maint: multiple names: authors list (link)
  4. https://web.archive.org/web/20240131093025/https://e.infogram.com/_/koS3z7vmIOEmqftYMv2Q?parent_url=https%3A%2F%2Fwww.spglobal.com%2Fmarketintelligence%2Fen%2Fnews-insights%2Fblog%2Fbanking-essentials-january-24th&src=embed. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)
  5. https://www.thewindpower.net/windfarm_en_2910.php https://www.thewindpower.net/windfarm_en_2910.php, https://www.thewindpower.net/windfarm_en_2910.php. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. https://web.archive.org/web/20240131093027/https://theprowersjournal.com/2019/12/replacement-process-for-colorado-green-turbines-to-begin/. Archived from the original on 2024-01-31. {{cite web}}: Missing or empty |title= (help)