Copalar Bajo hydroelectric plant (Central Hidroeléctrica Copalar Bajo) is a hydroelectric power plant in pre-construction in La Cruz de Rio Grande, Nicaragua.
Project Details
Table 1: Project details for Copalar Bajo hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner | Operator |
---|---|---|---|---|---|---|
Pre-construction[1] | 2026 (planned)[2] | 150 MW[3] | 3 x 50 MW[2] | Conventional storage[4] | Empresa Nicaragüense de Electricidad (ENEL)[4] | Empresa Nicaragüense de Electricidad (ENEL)[4] |
Location
Table 2: Location details for Copalar Bajo hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
La Cruz de Rio Grande, Nicaragua[4] | Río Grande[4] | 13.1303, -84.1249 (approximate)[4] |
The map below shows the approximate location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global nuclear power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://web.archive.org/web/20220630234552/https://enel.gob.ni/wp-content/uploads/2021/10/Factibilidad.pdf. Archived from the original (PDF) on 30 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://www.power-technology.com/marketdata/power-plant-profile-copalar-bajo-nicaragua/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220624150912/https://www.sica.int/download/?89390. Archived from the original on 24 June 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20220624152318/https://www.gvip.io/p/copalar-bajo-hydro-power-plant-150mw. Archived from the original on 24 June 2022.
{{cite web}}
: Missing or empty|title=
(help)