Copperton Solar Park

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Copperton Solar Plant No. 1

Copperton Solar Park is an announced solar photovoltaic (PV) farm in Salt Lake County, Utah, United States.

Project Details

Table 1: Phase-level project details for Copperton Solar Park

Status Commissioning year Nameplate capacity Technology Owner Operator
Announced[1] 2025 (planned)[1] 25 MWac[1] PV[1] Rio Tinto Group [100%][2] Kennecott Utah Copper[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Copperton Solar Park

Location Coordinates (WGS 84)
Salt Lake County, Utah, United States[1] 40.5766, -112.0846 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  2. https://web.archive.org/web/20240206195641/https://www.sltrib.com/renewable-energy/2022/06/08/see-where-rio-tinto-is/. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)