Cordon Solar Power Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Cordon Solar Power Project is a solar photovoltaic (PV) farm in pre-construction in Cordon, Isabela Province, Philippines.
Project Details
Table 1: Phase-level project details for Cordon Solar Power Project
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2025 (planned)[2] | 40 MWac[3] | PV[4] | Greenenergy Solutions Inc [100%][5] |
2 | Cancelled (inferred August 2023) | – | 150 MW[4] | PV[4] | Greenenergy Solutions Inc [100%][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Cordon Solar Power Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Cordon, Isabela Province, Philippines[6] | 16.6740, 121.4662 (approximate)[6] |
2 | Cordon, Isabela Province, Philippines[4] | 16.6740, 121.4662 (approximate)[4] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon_Committed_30_apr_2024.pdf https://www.pds.com.ph/wp-content/uploads/2022/04/Disclosure-No.-1206-2022-Preliminary-Informtion-Statement-for-Annual-Stockholders-Meeting-on-May-31-2022-Record-Date-on-March-4-2022.pdf, https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon_Committed_30_apr_2024.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon_Committed_30_apr_2024.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.eco-business.com/press-releases/greenergy-breaks-ground-for-200-mw-solar-plus-storage-project-in-isabela/ https://www.pds.com.ph/wp-content/uploads/2022/04/Disclosure-No.-1206-2022-Preliminary-Informtion-Statement-for-Annual-Stockholders-Meeting-on-May-31-2022-Record-Date-on-March-4-2022.pdf, https://www.eco-business.com/press-releases/greenergy-breaks-ground-for-200-mw-solar-plus-storage-project-in-isabela/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20240201133814/https://www.eco-business.com/press-releases/greenergy-breaks-ground-for-200-mw-solar-plus-storage-project-in-isabela/. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240201133809/https://www.pds.com.ph/wp-content/uploads/2022/04/Disclosure-No.-1206-2022-Preliminary-Informtion-Statement-for-Annual-Stockholders-Meeting-on-May-31-2022-Record-Date-on-March-4-2022.pdf. Archived from the original (PDF) on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 (PDF) https://web.archive.org/web/20240308203935/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf. Archived from the original (PDF) on 2024-03-08.
{{cite web}}
: Missing or empty|title=
(help)