Corredor Do Senandes wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Corredor Do Senandes wind farm (Complexo Eólico Corredor do Senandes) is an operating wind farm in Rio Grande, Aglomeração Urbana do Sul, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil.

Project Details

Table 1: Phase-level project details for Corredor Do Senandes wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
Corredor do Senandes 2 Operating[1] 2015[1] 22 MW[1] Onshore[1] Grupo NC [100%][2][3] ADS Energia[4]
Corredor do Senandes 3 Operating[1] 2015[1] 27 MW[1] Onshore[1] Grupo NC [100%][2][3] ADS Energia[4]
Corredor do Senandes 4 Operating[1] 2015[1] 30 MW[1] Onshore[1] Grupo NC [100%][2][3] ADS Energia[4]
Vento Aragano 1 Operating[1] 2015[1] 30 MW[1] Onshore[1] Grupo NC [100%][2][3] ADS Energia[4]

Location

Table 2: Phase-level location details for Corredor Do Senandes wind farm

Phase Name Location Coordinates (WGS 84)
Corredor do Senandes 2 Rio Grande, Aglomeração Urbana do Sul, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil[1] -32.3862, -52.327 (exact)[1]
Corredor do Senandes 3 Rio Grande, Aglomeração Urbana do Sul, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil[1] -32.4127, -52.3555 (exact)[1]
Corredor do Senandes 4 Rio Grande, Aglomeração Urbana do Sul, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil[1] -32.3689, -52.342 (exact)[1]
Vento Aragano 1 Rio Grande, Aglomeração Urbana do Sul, Região Geográfica Intermediária de Pelotas, Rio Grande do Sul, Brazil[1] -32.4145, -52.3729 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20240131084218/https://www.gruponc.net.br/noticia/grupo-nc-adquire-ativos-de-energia-eolica. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240131084407/https://www.jornaldocomercio.com/_conteudo/economia/2019/06/689578-parque-eolico-em-rio-grande-sera-expandido.html. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 https://web.archive.org/web/20211008030050/https://revistamodal.com.br/siemens-ganha-licitacao-para-contrato-de-om-do-complexo-eolico-corredor-dos-senandes/. Archived from the original on 08 October 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)