Corriegarth wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Corriegarth-2 (Phase 2)
Corriegarth wind farm is an operating wind farm in Highland, Scotland, United Kingdom.
Project Details
Table 1: Phase-level project details for Corriegarth wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2016[1] | 69.5 MW[1] | Onshore[1] | Greencoat UK Wind [100%][1] | Greencoat UK Wind[1] |
2 | Pre-construction[1] | – | 67.2 MW[1] | Onshore[1] | BayWa r.e. UK Ltd [100%][2] | – |
Location
Table 2: Phase-level location details for Corriegarth wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Highland, Scotland, Scotland, United Kingdom[1] | 57.1901, -4.3596 (exact)[1] |
2 | Highland, Scotland, Scotland, United Kingdom[1] | 57.3865, -4.2361 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27.
{{cite web}}
: Check date values in:|date=
(help) - ↑ https://www.baywa-re.co.uk/en/wind/corriegarth-2-windfarmgeneral-information https://www.inverness-courier.co.uk/news/disappointment-over-council-objection-to-wind-turbines-286728/, https://www.baywa-re.co.uk/en/wind/corriegarth-2-windfarmgeneral-information.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)