Currimao (MERALCO) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Baras solar farm
Currimao (MERALCO) solar farm is a solar photovoltaic (PV) farm in pre-construction in Baras, Rizal Province, Philippines.
Project Details
Table 1: Phase-level project details for Currimao (MERALCO) solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Pre-construction[1] | 2023 (planned)[1] | 75 MWac[1] | PV[1] | MERALCO PowerGen CORP (MGen) [100%][1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Currimao (MERALCO) solar farm
Location | Coordinates (WGS 84) |
---|---|
Baras, Rizal Province, Philippines[1] | 14.5505, 121.2717 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References