Currimao (MERALCO) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Baras solar farm

Currimao (MERALCO) solar farm is a solar photovoltaic (PV) farm in pre-construction in Baras, Rizal Province, Philippines.

Project Details

Table 1: Phase-level project details for Currimao (MERALCO) solar farm

Status Commissioning year Nameplate capacity Technology Owner
Pre-construction[1] 2023 (planned)[1] 75 MWac[1] PV[1] MERALCO PowerGen CORP (MGen) [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Currimao (MERALCO) solar farm

Location Coordinates (WGS 84)
Baras, Rizal Province, Philippines[1] 14.5505, 121.2717 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20230710153544/http://mb.com.ph/2023/3/30/m-green-vena-energy-start-solar-project-commercial-operation. Archived from the original on 10 July 2023. {{cite web}}: Missing or empty |title= (help)