Currimao Solar Power Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: 64.260 MWp/48.118 MW Currimao Solar Power Project (Phase 2), Currimao Solar
Currimao Solar Power Project is an operating solar photovoltaic (PV) farm in Batac, Ilocos Norte Province, Philippines.
Project Details
Table 1: Phase-level project details for Currimao Solar Power Project
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2016[1] | 20 MWp/dc[1] | PV[1] | Mirae Asia Energy CORP [100%][2][1] | Mirae Asia Energy CORP[1] |
2 | Construction[3] | 2023 (planned)[3] | 64 MWp/dc[4] | PV[5] | Nuevo Solar Energy CORP [100%][5] | – |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Currimao Solar Power Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Batac, Ilocos Norte Province, Philippines[6] | 18.051, 120.4858 (exact)[6] |
2 | Currimao, Ilocos Norte Province, Philippines[7] | 18.0604, 120.5043 (approximate)[7] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 (PDF) https://web.archive.org/web/20221017093316/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/electric_power_plants_luzon_december_2020.pdf. Archived from the original (PDF) on 17 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20210827170617/https://www.venaenergy.com/all_news/equis-commissions-20mw-solar-project-in-the-philippines/. Archived from the original on 27 August 2021.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 (PDF) https://web.archive.org/web/20240125191717/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240125191519/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20220816002428/https://mb.com.ph/2022/02/08/mgreen-singaporean-firm-seal-jv-for-ilocos-solar-project/. Archived from the original on 16 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://www.google.com/maps/place/18%C2%B003'02.9%22N+120%C2%B029'08.9%22E/@18.0508051120.4836113716m/data=!3m2!1e3!4b1!4m5!3m4!1s0x0:0x0!8m2!3d18.0508!4d120.4858.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 (PDF) https://web.archive.org/web/20240308203935/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf. Archived from the original (PDF) on 08 March 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)