DETES 1 power station (DETES 1 Termik Santrali) is a cancelled power station in Çatalağzı, Zonguldak, Türkiye.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
DETES 1 power station | Çatalağzı, Zonguldak, Türkiye | 41.498, 31.868 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|
cancelled | coal: lignite | 160 | unknown |
Table 3: Unit-level ownership and operator details
Owner | Parent |
---|---|
Demir Madencilik AŞ [100%] | Demir Madencilik AŞ [100.0%] |
Project-level coal details
- Coal source(s): domestic
Background
Demir Madencilik Petrol Products plans to build a 160 MW domestic coal-fired DETES-1 Integrated Thermal Power Plant in Zonguldak. The EIA is underway.[1] A meeting to review the plant's plan for coal ash storage and discharge was scheduled for October 2017.[2]
A leading environmental engineer claims cancer causing airborne particles (PM10) already exceed WHO limits due to existing local coal plants, and that ash storage would cause significant air and sea pollution.[3]
As of November 2021 there has been no progress on the plant in more than four years, and it appears to be cancelled.
Articles and Resources
References
- ↑ "Zonguldak`a 160 MW`lık DETES-1 Entegre Termik Santrali," Enerji Gunlugu, 1-12-2015
- ↑ DETES 1 Entegre Termik Santrali incelenecek Kaynak: DETES 1 Entegre Termik Santrali incelenecek , Enerji Gunlugu, Sep. 21, 2019
- ↑ "Çatalağzı nefes alamıyor, yeni termik santraller planlanıyor," evrensel, 19-12-2017