DP3- DP4- Sabratha Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

DP3- DP4- Sabratha Gas Pipeline is an under construction gas pipeline to run from Bouri Field to Sabratha platform in Libya.[1]

Location

The pipeline was proposed to run from Bouri Field to Sabratha platform in Libya.[1]

Loading map...

Project details

  • Operator: Mellitah Oil & Gas[1]
  • Owner: National Oil Corporation (50%), Eni (50%)[2]
  • Parent company: National Oil Corporation (50%), Eni (50%)[2]
  • Capacity:
  • Length: 28 km[3]
  • Diameter:
  • Status: Construction[3]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 "Saipem Secures $1-Billion Contract for Libyan Natural Gas Field". JPT. 2023-08-09. Retrieved 2024-08-08.
  2. 2.0 2.1 "شركة مليتة للنفط و الغاز". mellitahog.ly. Retrieved 2024-08-08.
  3. 3.0 3.1 محمد, ماجد (2023-08-10). ""سايبم" الإيطالية تحصل على عقد لتطوير حقل غاز البوري في ليبيا". صحيفة الشاهد الليبية (in العربية). Retrieved 2024-08-08.