Dabieshan power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Dabieshan power station (中电国际黄冈大别山发电厂, 中煤集团大别山电厂三期 2×1000MW清洁煤电扩建工程) is an operating power station of at least 2600-megawatts (MW) in Zhongguanyi Town, Macheng, Huanggang, Hubei, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Dabieshan power station | Zhongguanyi Town, Macheng, Huanggang, Hubei, China | 31.1420662, 114.8921871 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 31.1420662, 114.8921871
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Phase I Unit 1 | operating | coal: bituminous | 640 | supercritical | 2008 |
Phase I Unit 2 | operating | coal: bituminous | 640 | supercritical | 2008 |
Phase II Unit 3 | operating | coal: bituminous | 660 | supercritical | 2020 |
Phase II Unit 4 | operating | coal: bituminous | 660 | supercritical | 2020 |
Phase III Unit 5 | permitted | coal: unknown | 1000 | ultra-supercritical | – |
Phase III Unit 6 | permitted | coal: unknown | 1000 | ultra-supercritical | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Phase I Unit 1 | Huanggang Dabieshan Power Co Ltd [100%] | Huaihe Energy Holding Group Co Ltd [34.8%]; China National Coal Group [30.6%]; China Power International Development Co Ltd [20.4%]; other [10.7%]; China Cinda Asset Management Co Ltd [3.5%] |
Phase I Unit 2 | Huanggang Dabieshan Power Co Ltd [100%] | Huaihe Energy Holding Group Co Ltd [34.8%]; China National Coal Group [30.6%]; China Power International Development Co Ltd [20.4%]; other [10.7%]; China Cinda Asset Management Co Ltd [3.5%] |
Phase II Unit 3 | Huanggang Dabieshan Power Co Ltd [100%] | Huaihe Energy Holding Group Co Ltd [34.8%]; China National Coal Group [30.6%]; China Power International Development Co Ltd [20.4%]; other [10.7%]; China Cinda Asset Management Co Ltd [3.5%] |
Phase II Unit 4 | Huanggang Dabieshan Power Co Ltd [100%] | Huaihe Energy Holding Group Co Ltd [34.8%]; China National Coal Group [30.6%]; China Power International Development Co Ltd [20.4%]; other [10.7%]; China Cinda Asset Management Co Ltd [3.5%] |
Phase III Unit 5 | Xinyuan Fusion (Beijing) Power Co Ltd [100%] | China National Coal Group [60.0%]; China Power International Development Co Ltd [40.0%] |
Phase III Unit 6 | Xinyuan Fusion (Beijing) Power Co Ltd [100%] | China National Coal Group [60.0%]; China Power International Development Co Ltd [40.0%] |
Project-level coal details
- Permit(s):
Background
The first two coal-fired units of Dabieshan power station, totaling 1,280 MW, were brought online in 2008. The plant is majority-owned by China Power Investment Corporation (CPI).[1]
First Expansion (Phase II)
In 2014, CPI planned to build additional coal-fired units at this plant, units 3-4 with a total capacity of 1,320 MW.[2][3]
Construction on the expansion began in August 2016, despite 2016 China regulations that suspended the building of new plants in the province until 2018.[4] However, because the plant is a government poverty reduction project, it is likely exempted from the restrictions on new coal plant builds.[5] It is planned for operation in 2019.[6]
Unit 3 was commissioned in May 2020.[7] Unit 4 was commissioned in December 2020.[8]
Second Expansion Proposed (Phase III)
Two additional 1,000 MW units were listed in Hubei Province's power development 14th Five-Year-Plan in November 2022.[9] The two units were permitted in January 2023, according to news reporting.[10]
Ownership
In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[11]
Articles and Resources
References
- ↑ "美丽电厂中国行—中电投大别山发电有限公司", 电站资讯网, 2014-04-30
- ↑ "中电投大别山电厂二期工程可研报告通过评审",中国机经网, 2014-03-20
- ↑ "黄冈大别山发电有限责任公司二期扩建工程灰场运灰道路穿越高速铁路安全评估及设计招标公告," dlztb.org, 2015-5-3
- ↑ "湖北大别山电厂二期项目涉嫌首个违反煤电“急刹车”政策," 北极星电力网, 2016-08-02
- ↑ Communication with Greenpeace East Asia, July 3, 2017
- ↑ "黄冈大别山发电有限责任公司招聘公告," 中电国际 , 2017.09.06
- ↑ "2×660MW!大别山发电厂二期扩建工程顺利通过168小时试运行," 北极星电力网新闻中心, 2020/5/25
- ↑ "660MW!大别山4号机组一次性通过168小时满负荷试运行 - 北极星火力发电网". news.bjx.com.cn. 2020-12-28. Retrieved 2020-12-31.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "2×1000MW!国家电投大别山发电三期扩建项目纳入湖北省“十四五”电力建设规划," BJX, 2022-11-28
- ↑ [https://news.bjx.com.cn/html/20230302/1292011.shtml 湖北3个煤电大项目同日核准:4×1000MW+2×660MW!} BJX, 2023-03-02
- ↑ "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.