Panxian-2 power station (粤电粤黔盘南电厂) is an operating power station of at least 2400-megawatts (MW) in Liupanshui City, Pan, Liupanshui, Guizhou, China with multiple units, some of which are not currently operating. It is also known as 贵州粤黔电力有限责任公司 (Phase III Unit 5), 响水电厂 (Phase III Unit 5, Phase III Unit 6).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Panxian-2 power station Liupanshui City, Pan, Liupanshui, Guizhou, China 25.4686039, 104.5924059 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 25.4686039, 104.5924059

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 operating coal: bituminous 600 subcritical 2006
Phase I Unit 2 operating coal: bituminous 600 subcritical 2006
Phase II Unit 3 operating coal: bituminous 600 subcritical 2007
Phase II Unit 4 operating coal: bituminous 600 subcritical 2007
Phase III Unit 5 announced coal: bituminous 660 supercritical
Phase III Unit 6 announced coal: bituminous 660 supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Guizhou Yueqian Electric Power Co Ltd [100%] Guangdong Hengjian Investment Holding Co Ltd [48.8%]; China Huaneng Group Co Ltd [15.4%]; Guangzhou Development Group Inc [15.0%]; Guangdong Electric Power Development Co Ltd [13.0%]; other [7.8%]
Phase I Unit 2 Guizhou Yueqian Electric Power Co Ltd [100%] Guangdong Hengjian Investment Holding Co Ltd [48.8%]; China Huaneng Group Co Ltd [15.4%]; Guangzhou Development Group Inc [15.0%]; Guangdong Electric Power Development Co Ltd [13.0%]; other [7.8%]
Phase II Unit 3 Guizhou Yueqian Electric Power Co Ltd [100%] Guangdong Hengjian Investment Holding Co Ltd [48.8%]; China Huaneng Group Co Ltd [15.4%]; Guangzhou Development Group Inc [15.0%]; Guangdong Electric Power Development Co Ltd [13.0%]; other [7.8%]
Phase II Unit 4 Guizhou Yueqian Electric Power Co Ltd [100%] Guangdong Hengjian Investment Holding Co Ltd [48.8%]; China Huaneng Group Co Ltd [15.4%]; Guangzhou Development Group Inc [15.0%]; Guangdong Electric Power Development Co Ltd [13.0%]; other [7.8%]
Phase III Unit 5 Guizhou Yueqian Electric Power Co Ltd [100%] Guangdong Hengjian Investment Holding Co Ltd [48.8%]; China Huaneng Group Co Ltd [15.4%]; Guangzhou Development Group Inc [15.0%]; Guangdong Electric Power Development Co Ltd [13.0%]; other [7.8%]
Phase III Unit 6 Guizhou Yueqian Electric Power Co Ltd [100%] Guangdong Hengjian Investment Holding Co Ltd [48.8%]; China Huaneng Group Co Ltd [15.4%]; Guangzhou Development Group Inc [15.0%]; Guangdong Electric Power Development Co Ltd [13.0%]; other [7.8%]

Background

The first four coal-fired units of Panxian-2 power station, totaling 2,400 MW, were brought online between 2006 and 2007. The plant is sponsored by Yueqian Power Co., a subsidiary of Guangdong Yudean Group.[1] The electricity it generates supplies Guangdong Province.[2]

Description of Expansion

Plant owner Guizhou Yueqian Power Co is planning to build two additional coal-fired units at this plant, with a planned capacity of 660 MW each.[3][4][5][6]

There were no further developments on the proposed units after 2013, and they were likely suspended due to the country's traffic light policy, a national measure implemented in 2016 that prohibited new coal plant development throughout most of China's provinces, including Guizhou. However in March 2019 Guizhou was given a green light for new coal plants. In February 2020 it was announced that plans for development of the two units was revived.[7]

In 2023, with no further news, Phase III was presumed to be cancelled.

Plant Details for Existing Units 1-4

  • Sponsor: Guizhou Yueqian Power Co
  • Parent company: Guangdong Yudean Group (98%), China Southern Power Grid (2%)
  • Location: Xiangshui, Pan County, Liupanshui Prefecture, Guizhou Province, China
  • Coordinates: 25.4686039, 104.5924059 (exact)
  • Status: Operating
  • Gross capacity: 2,400 MW (Units 1-4: 600 MW)
  • Start year: 2006 (Units 1 & 2); 2007 (Units 3 & 4)
  • Type: Subcritical
  • Coal type:
  • Coal source:
  • Source of financing:

Articles and Resources

References

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.