Date Golden wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Date Kogane wind farm, Data Kogane wind farm, Euros Date Kogane wind farm, Eurus Date wind farm
Date Golden wind farm (ユーラス伊達黄金ウインドファーム) is an operating wind farm in Date City, Japan.
Project Details
Table 1: Phase-level project details for Date Golden wind farm
Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|
Operating[1] | 2017[2] | 34 MW[1] | Onshore | Eurus Energy [100%] (株式会社ユーラスエナジーホールディングス)[1][3] | Eurus Energy (株式会社ユーラスエナジーホールディングス)[4] |
Location
Table 2: Phase-level location details for Date Golden wind farm
Location | Coordinates (WGS 84) |
---|---|
Date City, Japan[2] | 42.4277, 140.9708 (exact)[2] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 https://web.archive.org/web/20220221015856/https://www.eurus-energy.com/en/project/project-list/. Archived from the original on 21 February 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 https://web.archive.org/web/20240126160934/https://www.eurus-energy.com/en/project/project-jp/9861/. Archived from the original on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131105530/https://www.eurus-energy.com/en/aboutus/. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131035004/https://www.thewindpower.net/windfarm_en_10405.php. Archived from the original on 31 January 2024.
{{cite web}}
: Missing or empty|title=
(help)