Delong Nickel Phase III power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Delong Nickel Phase III power station is an operating power station of at least 945-megawatts (MW) in Bungintimbe, Petasia, Morowali Regency, Central Sulawesi, Indonesia with multiple units, some of which are not currently operating. It is also known as 德龙镍业印尼自备电厂三期.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Delong Nickel Phase III power station | Bungintimbe, Petasia, Morowali Regency, Central Sulawesi, Indonesia | -2.004694, 121.4380707 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 01, Unit 02, Unit 03, Unit 04, Unit 05, Unit 06, Unit 07: -2.004694, 121.4380707
- Unit 08: -2.0166271, 121.4307371
- Unit 09, Unit 10, Unit 11, Unit 12: -2.0142686, 121.4296885
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year |
---|---|---|---|---|---|
Unit 01 | operating | coal: unknown | 135 | unknown | 2021 |
Unit 02 | operating | coal: unknown | 135 | unknown | 2023 |
Unit 03 | operating | coal: unknown | 135 | unknown | 2023 |
Unit 04 | operating | coal: unknown | 135 | unknown | 2023 |
Unit 05 | operating | coal: unknown | 135 | unknown | 2023 |
Unit 06 | operating | coal: unknown | 135 | unknown | 2023 |
Unit 07 | operating | coal: unknown | 135 | unknown | 2023 |
Unit 08 | construction | coal: unknown | 150 | unknown | – |
Unit 09 | construction | coal: unknown | 300 | unknown | – |
Unit 10 | construction | coal: unknown | 300 | unknown | – |
Unit 11 | construction | coal: unknown | 300 | unknown | – |
Unit 12 | construction | coal: unknown | 300 | unknown | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 01 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 02 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 03 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 04 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 05 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 06 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 07 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 08 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 09 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 10 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 11 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Unit 12 | PT Gunbuster Nickel Industry [100%] | Jiangsu Delong Nickel Industry Co Ltd |
Project-level captive use details
- Captive industry use (heat or power): power
- Captive industry: Nickel, Other Metals & Mining
Background on Project
Planet imagery from December 2021 and April 2022 shows development at the site.
As of December 2021, the following construction companies were involved:[1]
- Design: China Power Construction Group Jiangxi Electric Power Design Institute (中国电建集团江西省电力设计院)
- Installation: Jiangsu Tangdian Electric Power Installation Co., Ltd. (江苏唐电电力安装有限公司)
- Public and auxiliary installation: Jiangsu Tianmu Installation, Jiangsu Ningyang (江苏天目安装、江苏宁扬)
- Civil engineering: Chuzhou Pengde, Henan Second Construction, Nantong Construction Engineering (滁州鹏德、河南二建、南通建工)
As of January 2023, construction appeared to be ongoing.
In March 2023, the 7 x 135 MW units at the power station were described as connected to the grid and operational. Units 8-12 remained under construction.[2]
As of March 2024, further construction progress at the site was evident based on Planet imagery.
Worker conflict
In January 2023, a violent clash occurred between Indonesian and Chinese workers at the power station, resulting in two deaths. The National Workers’ Union held a meeting to make a series of demands to PT Gunbuster Nickel Industry, but the company denied all of the demands. The union initiated a strike action, and the physical conflict reportedly began when the Chinese workers refused to join the Indonesian workers in the strike. 70 people were arrested in association with the incident.[3]
In May 2024, an article described ongoing tension between Delong Nickel and Chinese workers. Workers reportedly had wages withheld for up to five months.[4]
Financing
In January 2022, a ceremony was held among the Jiangsu Branch of China Export Credit Insurance Company, Jiangsu Bank Co., Ltd., Jiangsu Huihong International Group Zhongding holding Co., Ltd., and Jiangsu Delong Nickel Industry Co., Ltd. for the export project of "Belt and Road Initiative" between the latter and bank enterprises to gather high-quality resources from all sides to jointly support the construction of the third phase of the Delong Industrial Park in Indonesia, including the power plant.[5] It is not known if the financing went ahead.
Articles and Resources
References
- ↑ 印尼德龙北莫洛瓦里基地GNI公司发电厂1号机组正式并网发电!, cnfeol, December 6, 2021
- ↑ 科远智慧携手江苏德龙:8年精诚,共建高水平“一带一路”标杆工程, m.ccidii.com, March 29, 2023
- ↑ Chinese and Indonesian Workers Clash at Indonesian Nickel Plant, The Diplomat, January 17, 2023
- ↑ 常年欠薪:中国工人在印尼钢铁厂遭遇的困境, 工事有料, May 15, 2024
- ↑ "The third phase of Delong Industrial Park in Indonesia has been signed". /news.metal.com. January 2022.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.