Desa Eurus wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Desa Eurus wind farm (Complexo Eólico Desa Eurus) is an operating wind farm in João Câmara , Região Geográfica Intermediária de Natal, Rio Grande do Norte, Brazil.
Project Details
Table 1: Phase-level project details for Desa Eurus wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
Eurus 1 | Operating[1] | 2014[1] | 30 MW[1] | Onshore[2] | CPFL Renováveis [100%][3] | CPFL Renováveis[3] |
Eurus 3 | Operating[1] | 2014[1] | 30 MW[1] | Onshore[2] | CPFL Renováveis [100%][3] | CPFL Renováveis[3] |
Location
Table 2: Phase-level location details for Desa Eurus wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Eurus 1 | João Câmara , Região Geográfica Intermediária de Natal, Rio Grande do Norte, Brazil[1] | -5.3655, -35.8621 (exact)[1] |
Eurus 3 | João Câmara , Região Geográfica Intermediária de Natal, Rio Grande do Norte, Brazil[1] | -5.3971, -35.8748 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 Agência Nacional de Energia Elétrica - ANEEL (2024-02-10). "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. Retrieved 2024-09-18.
{{cite web}}
: Check|archive-url=
value (help) - ↑ 2.0 2.1 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 https://fintel.io/doc/sec-cpl-cpfl-energia-20f-2020-april-24-18378-960 https://cpfl.riweb.com.br/Download.aspx?Arquivo=Zc4wiPxmXrMpa2YIFIpZ+A==&IdCanal=DCG+v5pIz9nk3PwHEBgbPQ==, https://fintel.io/doc/sec-cpl-cpfl-energia-20f-2020-april-24-18378-960.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help)