Desert Claim Wind Power Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Desert Claim Wind Power Project is a wind farm in pre-construction in Ellensburg, Kittitas County, Washington, United States.

Project Details

Table 1: Phase-level project details for Desert Claim Wind Power Project

Phase name Status Nameplate capacity Type Owner
1 Pre-construction[1] 100 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[2]

Location

Table 2: Phase-level location details for Desert Claim Wind Power Project

Phase Name Location Coordinates (WGS 84)
1 Ellensburg, Kittitas County, Washington, United States[1] 46.9941, -120.547 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125175517/https://www.efsec.wa.gov/energy-facilities/desert-claim. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240131093533/https://www.yakimaherald.com/news/local/proposal-would-reduce-size-of-desert-claim-wind-farm/article_6daba19c-23af-11e8-852d-bffe4eaa3fc4.html. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)