Diantou power station (陕煤集团黄陵矿业店头发电厂) is an operating power station of at least 1320-megawatts (MW) in Diantou Town, Huangling, Yan'an, Shaanxi, China with multiple units, some of which are not currently operating. It is also known as 陕煤黄陵店头电厂三期2×1000MW机组扩建项目 (Phase III Unit 5 & 6), 陕煤黄陵店头电厂二期2×1000MW机组扩建项目 (Phase II Unit 3 & 4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Diantou power station Diantou Town, Huangling, Yan'an, Shaanxi, China 35.657848, 109.050538 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 35.657848, 109.050538

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year
Phase I Unit 1 Operating coal: unknown 660 ultra-supercritical 2023
Phase I Unit 2 Operating coal: unknown 660 ultra-supercritical 2023
Phase II Unit 3 Construction[1] coal: unknown 1000 ultra-supercritical
Phase II Unit 4 Construction[1] coal: unknown 1000 ultra-supercritical
Phase III Unit 5 Permitted coal: unknown 1000 ultra-supercritical
Phase III Unit 6 Permitted coal: unknown 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Shaanxi Huangling Power Generation Co Ltd [100%] Shaanxi Coal and Chemical Industry Co Ltd [31.0%]; Xi'an Jinxuan Investment Management Partnership LP [29.6%]; Jiangsu Yueda Group Co Ltd [23.6%]; Industrial and Commercial Bank of China Ltd [7.9%]; Xi'an Jingfa Holding (Group) Co Ltd [1.1%]; Shaanxi Finance Investment Management Co Ltd [1.1%]; China Construction Bank Corp [1.0%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.9%]; unknown [0.8%]; Far East Horizon [0.8%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.8%]; Yulin Investment Operation Group Co Ltd [0.8%]; Shaanxi International Trust Co Ltd [0.4%]; Chang'an Huitong Co Ltd [0.1%]
Phase I Unit 2 Shaanxi Huangling Power Generation Co Ltd [100%] Shaanxi Coal and Chemical Industry Co Ltd [31.0%]; Xi'an Jinxuan Investment Management Partnership LP [29.6%]; Jiangsu Yueda Group Co Ltd [23.6%]; Industrial and Commercial Bank of China Ltd [7.9%]; Xi'an Jingfa Holding (Group) Co Ltd [1.1%]; Shaanxi Finance Investment Management Co Ltd [1.1%]; China Construction Bank Corp [1.0%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.9%]; unknown [0.8%]; Far East Horizon [0.8%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.8%]; Yulin Investment Operation Group Co Ltd [0.8%]; Shaanxi International Trust Co Ltd [0.4%]; Chang'an Huitong Co Ltd [0.1%]
Phase II Unit 3 Shaanxi Huangling Power Generation Co Ltd [100%] Shaanxi Coal and Chemical Industry Co Ltd [31.0%]; Xi'an Jinxuan Investment Management Partnership LP [29.6%]; Jiangsu Yueda Group Co Ltd [23.6%]; Industrial and Commercial Bank of China Ltd [7.9%]; Xi'an Jingfa Holding (Group) Co Ltd [1.1%]; Shaanxi Finance Investment Management Co Ltd [1.1%]; China Construction Bank Corp [1.0%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.9%]; unknown [0.8%]; Far East Horizon [0.8%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.8%]; Yulin Investment Operation Group Co Ltd [0.8%]; Shaanxi International Trust Co Ltd [0.4%]; Chang'an Huitong Co Ltd [0.1%]
Phase II Unit 4 Shaanxi Huangling Power Generation Co Ltd [100%] Shaanxi Coal and Chemical Industry Co Ltd [31.0%]; Xi'an Jinxuan Investment Management Partnership LP [29.6%]; Jiangsu Yueda Group Co Ltd [23.6%]; Industrial and Commercial Bank of China Ltd [7.9%]; Xi'an Jingfa Holding (Group) Co Ltd [1.1%]; Shaanxi Finance Investment Management Co Ltd [1.1%]; China Construction Bank Corp [1.0%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.9%]; unknown [0.8%]; Far East Horizon [0.8%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.8%]; Yulin Investment Operation Group Co Ltd [0.8%]; Shaanxi International Trust Co Ltd [0.4%]; Chang'an Huitong Co Ltd [0.1%]
Phase III Unit 5 Shaanxi Huangling Power Generation Co Ltd [100%] Shaanxi Coal and Chemical Industry Co Ltd [31.0%]; Xi'an Jinxuan Investment Management Partnership LP [29.6%]; Jiangsu Yueda Group Co Ltd [23.6%]; Industrial and Commercial Bank of China Ltd [7.9%]; Xi'an Jingfa Holding (Group) Co Ltd [1.1%]; Shaanxi Finance Investment Management Co Ltd [1.1%]; China Construction Bank Corp [1.0%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.9%]; unknown [0.8%]; Far East Horizon [0.8%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.8%]; Yulin Investment Operation Group Co Ltd [0.8%]; Shaanxi International Trust Co Ltd [0.4%]; Chang'an Huitong Co Ltd [0.1%]
Phase III Unit 6 Shaanxi Huangling Power Generation Co Ltd [100%] Shaanxi Coal and Chemical Industry Co Ltd [31.0%]; Xi'an Jinxuan Investment Management Partnership LP [29.6%]; Jiangsu Yueda Group Co Ltd [23.6%]; Industrial and Commercial Bank of China Ltd [7.9%]; Xi'an Jingfa Holding (Group) Co Ltd [1.1%]; Shaanxi Finance Investment Management Co Ltd [1.1%]; China Construction Bank Corp [1.0%]; Shaanxi Yanchang Petroleum (Group) Co Ltd [0.9%]; unknown [0.8%]; Far East Horizon [0.8%]; Xi'an Urban Infrastructure Construction Investment Group Co Ltd [0.8%]; Yulin Investment Operation Group Co Ltd [0.8%]; Shaanxi International Trust Co Ltd [0.4%]; Chang'an Huitong Co Ltd [0.1%]

Background on Project

Huangling Coal Mining applied for environmental clearance to build a 2 x 660 MW coal plant in Huangling.[2] The EIA of the power plant was approved by the Shaanxi provincial EPA in September 2016.[3]

There were no further developments on the project until March 2019, when sponsor Huangling Coal Mining again discussed plans for the project.[4] As of March 2020 Huangling Coal Mining had completed the pre-feasibility study and was seeking environmental clearance.[5] The project was permitted in March 2020, with operation planned for 2023.[6][7]

Construction began on unit 1 in May 2021.[8] Unit 2 also appeared to be underway.

By October 2022, a second 2 x 1,000 MW phase was permitted. The first phase was still under construction.[9]

In May 2023, it was reported that construction of the first phase was nearly complete.[10] By the end of the same month, Unit 1 had begun operation.[11] In June 2023, Unit 2 also successfully connected to the grid and began operating.[12][13][14]

Articles and Resources

References

  1. 1.0 1.1 https://news.bjx.com.cn/html/20240619/1384010.shtml. {{cite web}}: Missing or empty |title= (help)
  2. "关于“黄陵矿业集团有限责任公司店头电厂2×660MW工程”项目环境影响报告书全文公示信息," Huangling Coal Mining, 2016-5-23
  3. "黄陵矿业集团店头电厂2×660MW工程取得环评批复"Huangling Mining Group, 2016-09-13
  4. "黄陵矿业公司2019年基本建设工作都有哪些新要求发布时间," Huangling Coal Mining, 2019-03-29
  5. "陕北—湖北特高压通道配套煤电规划获国家能源局批复,预计配置新能源项目6GW," SolarBe, 2020-03-08
  6. "陕北至湖北特高压配套4个大型火电项目已获核准 2个项目计划今年开工," 北极星电力网新闻中心, 2020/3/13
  7. "陕煤黄陵店头电厂2×660MW工程项目预计2022年底投产," china5e, 2021-08-26
  8. "2×660MW!陕西省一大型火电项目开工," Sohu, 2021-05-18
  9. "黄陵店头电厂二期2×1000MW机组扩建项目喜获核准批复," BJX, 2022-10-21
  10. 陕煤集团:黄陵矿业2×660MW电厂项目进入冲刺阶段 , Sohu News, 2023-05-12
  11. 陕西黄陵发电公司2×660兆瓦电厂项目1号机组投产, BJX, May 29, 2023
  12. 陕西黄陵2×660MW电厂项目2号机组首次并网一次成功, BJX, 2023-06-15
  13. 黄陵矿业2×660MW电厂项目实现“双机双投”, BJX, 2023-06-28
  14. 【项目】火电|2x1000MW!浙能嘉兴四期扩建9号机组EPC总承包开标/2×660MW!陕煤黄陵矿业电厂实现“双机双投”, MP Weixin, 2023-06-29