Diego De Almagro Sur Solar Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Diego De Almagro Sur Solar Project (Proyecto Solar Diego de Almagro Sur) is an operating solar photovoltaic (PV) farm in Diego de Almagro, Atacama, Chile.

Project Details

Table 1: Phase-level project details for Diego De Almagro Sur Solar Project

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2022[2] 115 MW[3] PV[4] ENGIE SA [100%][3] Colbun (Colbún SA)[3]
2 Operating[1] 2022[2] 115 MW[3] PV[4] ENGIE SA [100%][3] Colbun (Colbún SA)[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Diego De Almagro Sur Solar Project

Phase Name Location Coordinates (WGS 84)
1 Diego de Almagro, Atacama, Chile[5] -26.5874, -69.9596 (exact)[5]
2 Diego de Almagro, Atacama, Chile[5] -26.5874, -69.9596 (exact)[5]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20240207163005/https://www.pv-magazine.com/2022/11/30/colbun-switches-on-battery-linked-230-mw-solar-plant-in-chile/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240206163214/https://renews.biz/74018/wartsila-wins-chile-storage-contract/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://web.archive.org/web/20210827214742/https://www.colbun.cl/en/centrales/proyectos-diego-de-almagro-sur-i-y-ii/. Archived from the original on 27 August 2021. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240207120207/https://www.sma-sunny.com/us/work-to-begin-at-the-diego-de-almagro-sur-pv-power-plant-located-in-northern-chile/. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 https://goo.gl/maps/86M5BZkB3dTjD3se9. {{cite web}}: Missing or empty |title= (help)