Dieng geothermal power plant
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Dieng geothermal power plant is an operating geothermal power plant in Wonosobo, Central Java, Indonesia.
Project Details
Table 1: Unit-level project details for Dieng geothermal power plant
Unit name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 1998[2] | 60 MW[1] | Flash steam - single[3] | PT Geo Dipa Energi (GDE) [100%][4] | PT Geo Dipa Energi (GDE)[4] |
2 | Construction[5] | 2025 (planned)[6] | 55 MW[4] | Unknown type | PT Geo Dipa Energi (GDE) [100%][4] | PT Geo Dipa Energi (GDE)[4] |
3 | Pre-construction[7] | 2025 (planned)[8] | 55 MW[4] | Unknown type | PT Geo Dipa Energi (GDE) [100%][4] | PT Geo Dipa Energi (GDE)[4] |
Future units | Announced[8] | 2030 (planned)[8] | 270 MW[8] | Unknown type | PT Geo Dipa Energi (GDE) [100%][8] | PT Geo Dipa Energi (GDE)[8] |
Location
Table 2: Unit-level location details for Dieng geothermal power plant
Unit name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Wonosobo, Central Java, Indonesia | -7.2261, 109.8975 (exact) |
2 | Wonosobo, Central Java, Indonesia | -7.2261, 109.8975 (exact) |
3 | Wonosobo, Central Java, Indonesia | -7.2261, 109.8975 (exact) |
Future units | Wonosobo, Central Java, Indonesia | -7.2261, 109.8975 (exact) |
The map below shows the exact locations of the geothermal power plant units:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20221203163856/https://www.geodipa.co.id/bisnis-kami/lapangan-existing/. Archived from the original on 03 December 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20220418170605/https://repit.files.wordpress.com/2013/05/dieng-geo-dipa-energi1.pdf. Archived from the original (PDF) on 18 April 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221108130549/http://thinkgeoenergy.com/map. Archived from the original on 08 November 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://web.archive.org/web/20220707161846/https://www.thinkgeoenergy.com/geo-dipa-energi-plans-to-add-400-mw-geothermal-capacity/. Archived from the original on 07 July 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240319071113/https://pangea.stanford.edu/ERE/db/GeoConf/papers/SGW/2024/Alamsyah.pdf. Archived from the original (PDF) on 19 March 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://www.petromindo.com/news/article/indonesia-geothermal-q3-update-sluggish-process-in-pursuing-the-2023-target.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230324010258/https://www.geodipa.co.id/dieng-2-dan-patuha-2/. Archived from the original on 24 March 2023.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 https://web.archive.org/web/20220225004901/https://www.thinkgeoenergy.com/pt-geo-dipa-energi-sets-ambitious-1020-mw-by-2035-development-target-in-indonesia/. Archived from the original on 25 February 2022.
{{cite web}}
: Missing or empty|title=
(help)