Divor solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Divor solar farm is a solar photovoltaic (PV) farm in pre-construction in Évora, Alentejo, Portugal.

Project Details

Table 1: Phase-level project details for Divor solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Pre-construction[1][2] 2024 (planned)[3] 257 MW[4][2] PV[4] Hyperion Renewables [100%][4] Hyperion Renewables Évora Unipessoal, Lda[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Divor solar farm

Location Coordinates (WGS 84)
Évora, Alentejo, Portugal[4] 38.393, -7.9652 (approximate)[4]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240131072719/https://siaia.apambiente.pt/AIA1.aspx?ID=3343. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://www.pv-magazine.es/2023/05/22/a-informacion-publica-una-planta-de-260-mwp-de-hyperion-en-portugal/. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240206150944/https://www.power-technology.com/marketdata/divor-solar-pv-park-portugal/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240201214917/https://www.pv-magazine.com/2020/11/03/portugal-to-host-257-mw-solar-plus-storage-plant/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)