Dixie Meadows 1 Geothermal Development Project
From Global Energy Monitor
This article is part of the Global Geothermal Power Tracker, a Global Energy Monitor project. |
Dixie Meadows 1 Geothermal Development Project is a cancelled geothermal power plant in Churchill County, Nevada, United States.
Project Details
Table 1: Unit-level project details for Dixie Meadows 1 Geothermal Development Project
Status | Nameplate capacity | Technology | Owner |
---|---|---|---|
Cancelled[1][2] | 12 MW[3] | Binary cycle[4] | Ormat Technology Inc [100%][5] |
Location
Table 2: Unit-level location details for Dixie Meadows 1 Geothermal Development Project
Location | Coordinates (WGS 84) |
---|---|
Churchill County, Nevada, United States[6] | 39.7905, -118.0812 (exact)[6] |
The map below shows the exact location of the geothermal power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global geothermal power plants, a downloadable dataset, and summary data, please visit the Global Geothermal Power Tracker on the Global Energy Monitor website.
References
- ↑ https://web.archive.org/web/20240319072916/https://westernpriorities.org/2023/11/geothermal-is-heating-up-in-the-west-heres-what-you-need-to-know-about-geothermal-energy-development-and-potential-in-western-states/. Archived from the original on 2024-03-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://eplanning.blm.gov/eplanning-ui/project/75996/510.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20230402174943/https://www.nevadacurrent.com/2022/12/12/geothermal-developer-shrinks-plans-after-toads-endangered-listing/. Archived from the original on 2023-04-02.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220511220155/https://www.renewableenergyworld.com/baseload/us-federal-regulators-release-propose-action-for-dixie-meadows-geothermal-plan/. Archived from the original on 2022-05-11.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221104092138/https://biologicaldiversity.org/w/news/press-releases/nevada-geothermal-project-breaks-ground-while-court-battles-rage-2022-02-18/. Archived from the original on 2022-11-04.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://www.google.com/maps/place/Dixie+Meadows+Geothermal/@39.7905002,-118.0811794,4583m/data=!3m1!1e3!4m5!3m4!1s0x0:0x4cca4ab8ae750010!8m2!3d39.7905002!4d-118.0811794.
{{cite web}}
: Missing or empty|title=
(help)