Dogger Bank wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: formerly Creyke Beck B (Phase B), Cluaran Deas Ear (E3) (Phase A), Dogger Bank C (was Teesside A), Dogger Bank Creyke Beck C offshore wind farm (Phase C), Dogger Bank A & B (was Creyke Beck A & B) (Phases B, C), Dogger Bank Creyke Beck B offshore wind farm (Phase B), Cluaran Deas Ear (Thistle South East) (Phase A), Dogger Bank B (Phase B), Dogger Bank C (was Teesside A) wind farm, formerly Teesside C (Phase C)

Dogger Bank wind farm is an operating wind farm in England, United Kingdom.

Project Details

Table 1: Phase-level project details for Dogger Bank wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
A Operating[1] 2023[1] 1200 MW[2] Offshore hard mount[3] Vårgrønn AS [20%]; SSE Renewables [40%]; Equinor ASA [40%][4] Equinor[2]
B Construction[5] 2026 (planned)[6] 1200 MW[2] Offshore hard mount[3] Vårgrønn AS [20%]; SSE Renewables [40%]; Equinor Energy AS [40%][4] Equinor[2]
C Construction[7] 2026 (planned)[2] 1200 MW[7] Offshore hard mount[3] Eni SpA [20%]; SSE Renewables [40%]; Equinor ASA [40%][8] Equinor[2]
D Pre-construction[9] 1320 MW[3] Offshore hard mount[3] Equinor Energy AS [50%]; SSE Renewables [50%][10] Equinor[2]

Location

Table 2: Phase-level location details for Dogger Bank wind farm

Phase Name Location Coordinates (WGS 84)
A England, United Kingdom[7] 55.2100, 2.3300 (exact)[7]
B England, United Kingdom[7] 55.2100, 2.3300 (exact)[7]
C England, United Kingdom[7] 55.2100, 2.3300 (exact)[7]
D England, United Kingdom[7] 55.2100, 2.3300 (exact)[7]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 "World's largest offshore wind farm Dogger Bank produces power for the first time". www.equinor.com. 2023-10-10. Archived from the original on 2024-03-29. Retrieved 2024-02-29.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240126061332/https://www.sserenewables.com/offshore-wind/projects/dogger-bank/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 https://web.archive.org/web/20240126061408/https://www.equinor.com/news/20230206-early-scoping-work-potential-4th-phase-dogger-bank-wind-farm. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.sserenewables.com/offshore/projects/dogger-bank/, https://www.sserenewables.com/offshore/projects/dogger-bank/ https://www.sserenewables.com/offshore/projects/dogger-bank/, https://www.sserenewables.com/offshore/projects/dogger-bank/, https://www.sserenewables.com/offshore/projects/dogger-bank/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. https://www.equinor.com/news/202310-dogger-bank https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract, https://www.equinor.com/news/202310-dogger-bank. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. https://doggerbank.com/construction/foundation-installation-campaign-begins-on-dogger-bank-b/. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 7.6 7.7 7.8 7.9 "Renewable Energy Planning Database: quarterly extract". 2024-01. Archived from the original on 2024-03-27. Retrieved 2024-02-27. {{cite web}}: Check date values in: |date= (help)
  8. https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/, https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/ https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/, https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/, https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  9. https://web.archive.org/web/20230103162529/https://ieefa.org/articles/sse-equinor-looking-build-fourth-phase-worlds-largest-offshore-wind-farm. Archived from the original on 03 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. https://doggerbank.com/doggerbankd/ https://doggerbank.com/doggerbankd/, https://doggerbank.com/doggerbankd/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)