Dogger Bank wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Dogger Bank Creyke Beck C offshore wind farm (Phase C), Cluaran Deas Ear (E3) (Phase A), Dogger Bank C (was Teesside A), Cluaran Deas Ear (Thistle South East) (Phase A), Dogger Bank Creyke Beck B offshore wind farm (Phase B), Dogger Bank A & B (was Creyke Beck A & B) (Phases B, C), formerly Creyke Beck B (Phase B), Dogger Bank C (was Teesside A) wind farm, formerly Teesside C (Phase C), Dogger Bank B (Phase B)

Dogger Bank wind farm is an operating wind farm in United Kingdom.

Project Details

Table 1: Phase-level project details for Dogger Bank wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
A Operating[1] 2023[1] 1200 MW[2] Offshore hard mount[3] SSE Renewables [40%]; Vårgrønn AS [20%]; Equinor ASA [40%] (석유공사)[4][4][4] Equinor ASA (석유공사)[2]
B Construction[5][1] 2024 (planned)[2] 1200 MW[2] Offshore hard mount[3] Equinor [40%]; SSE Renewables [40%]; Vårgrønn AS [20%][4][4][4] Equinor ASA (석유공사)[2]
C Construction[5] 2026 (planned)[2] 1200 MW[2] Offshore hard mount[3] SSE Renewables [40%]; Equinor ASA [40%]; Eni SPA [20%] (석유공사)[6][6][6] Equinor ASA (석유공사)[2]
D Pre-construction[7] 1320 MW[3] Offshore hard mount[3] Equinor [50%]; SSE Renewables [50%][8][8] Equinor ASA (석유공사)[3]

Location

Table 2: Phase-level location details for Dogger Bank wind farm

Phase Name Location Coordinates (WGS 84)
A United Kingdom[5] 55.9673, 1.6679 (exact)[5]
B United Kingdom[5] 55.9673, 1.6679 (exact)[5]
C United Kingdom[5] 55.9673, 1.6679 (exact)[5]
D England, United Kingdom[3] 55.9673, 1.6679 (approximate)[3]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240329043618/https://www.equinor.com/news/202310-dogger-bank. Archived from the original on 29 March 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://web.archive.org/web/20240126061332/https://www.sserenewables.com/offshore-wind/projects/dogger-bank/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://web.archive.org/web/20240126061408/https://www.equinor.com/news/20230206-early-scoping-work-potential-4th-phase-dogger-bank-wind-farm. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20230307100849/https://www.sserenewables.com/offshore/projects/dogger-bank/. Archived from the original on 07 March 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://web.archive.org/web/20240327051815/https://www.gov.uk/government/publications/renewable-energy-planning-database-monthly-extract. Archived from the original on 27 March 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20240131163407/https://renews.biz/73327/eni-takes-20-slice-of-dogger-bank-c/. Archived from the original on 31 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20230103162529/https://ieefa.org/articles/sse-equinor-looking-build-fourth-phase-worlds-largest-offshore-wind-farm. Archived from the original on 03 January 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240327031606/https://doggerbank.com/doggerbankd/. Archived from the original on 27 March 2024. {{cite web}}: Missing or empty |title= (help)