Dolgoderevenskoye-Sysert Gas Pipeline

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Dolgoderevenskoye-Sysert Gas Pipeline (Russian: Газопровод Долгодеревенское - Сысерть) is an operating gas pipeline in Russia.[1]

Location

The pipeline starts in Dolgoderevenskoye, Chelyabinsk Oblast, Russia, and runs to Sysert, Sverdlovsk Oblast, Russia.[1]

Loading map...

Project Details

  • Operator: Gazprom transgaz Yekaterinburg[1]
  • Owner: Gazprom[1]
  • Parent company: Gazprom[1]
  • Capacity:
  • Length: 127 km[1]
  • Diameter: 1020 mm[2][3]
  • Status: Operating[1][3]
  • Start year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Газопровод Долгодеревенское - Сысерть". energybase.ru. Retrieved 2022-08-01.{{cite web}}: CS1 maint: url-status (link)
  2. Уралэкология. "Наши работы". Уралэкология: научно-производственное предприятие (in русский). Retrieved 2022-08-01.
  3. 3.0 3.1 "Нефтегазовая промышленность Челябинской области". uglevodorody.ru. January 13, 2023. Retrieved August 17, 2023.{{cite web}}: CS1 maint: url-status (link)