Dolgoderevenskoye-Sysert Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Dolgoderevenskoye-Sysert Gas Pipeline (Russian: Газопровод Долгодеревенское - Сысерть) is an operating gas pipeline in Russia.[1]
Location
The pipeline starts in Dolgoderevenskoye, Chelyabinsk Oblast, Russia, and runs to Sysert, Sverdlovsk Oblast, Russia.[1]
Project Details
- Operator: Gazprom transgaz Yekaterinburg[1]
- Owner: Gazprom[1]
- Parent company: Gazprom[1]
- Capacity:
- Length: 127 km[1]
- Diameter: 1020 mm[2][3]
- Status: Operating[1][3]
- Start year:
- Cost:
- Financing:
- Associated infrastructure:
Background
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 "Газопровод Долгодеревенское - Сысерть". energybase.ru. Retrieved 2022-08-01.
{{cite web}}
: CS1 maint: url-status (link) - ↑ Уралэкология. "Наши работы". Уралэкология: научно-производственное предприятие (in русский). Retrieved 2022-08-01.
- ↑ 3.0 3.1 "Нефтегазовая промышленность Челябинской области". uglevodorody.ru. January 13, 2023. Retrieved August 17, 2023.
{{cite web}}
: CS1 maint: url-status (link)