Dolores Canyon Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Dolores Canyon Solar is an announced solar photovoltaic (PV) farm in Cahone, Montezuma County, Colorado, United States.
Project Details
Table 1: Phase-level project details for Dolores Canyon Solar
Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|
Announced[1] | 2024 (planned)[2] | 110 MWac[1] | PV[1] | Juwi INC [100%][3] | Juwi INC[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Dolores Canyon Solar
Location | Coordinates (WGS 84) |
---|---|
Cahone, Montezuma County, Colorado, United States[1] | 37.705, -108.755 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20240201180704/https://www.juwiamericas.com/juwi-announces-four-new-colorado-solar-projects-with-tri%E2%80%90state/. Archived from the original on 01 February 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)