Dolores Canyon Solar

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Dolores Canyon Solar is an announced solar photovoltaic (PV) farm in Cahone, Montezuma County, Colorado, United States.

Project Details

Table 1: Phase-level project details for Dolores Canyon Solar

Status Commissioning year Nameplate capacity Technology Owner Operator
Announced[1] 2024 (planned)[2] 110 MWac[1] PV[1] Juwi INC [100%][3] Juwi INC[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Dolores Canyon Solar

Location Coordinates (WGS 84)
Cahone, Montezuma County, Colorado, United States[1] 37.705, -108.755 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20221028021258/https://www.eia.gov/electricity/data/eia860/. Archived from the original on 28 October 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240201180704/https://www.juwiamericas.com/juwi-announces-four-new-colorado-solar-projects-with-tri%E2%80%90state/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)