Dongguan Shijie (Xingning) Industrial Transfer Industrial Park power station
Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Dongguan Shijie (Xingning) Industrial Transfer Industrial Park power station (东莞石碣(兴宁)产业转移工业园分布式能源站项目) is an announced power station in Meizhou, Xinning, Guangdong, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Dongguan Shijie (Xingning) Industrial Transfer Industrial Park power station | Meizhou, Xinning, Guangdong, China | 24.173984, 115.697988 (approximate)[1][2][3] |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
---|---|---|---|---|---|---|
2-1 | Announced[1][3][2] | fossil gas: natural gas[1][3][4][2] | 53[2] | combined cycle[1] | yes[1] | 2025 (planned)[1] |
2-2 | Announced[1][2] | fossil gas: natural gas[1][3][4][2] | 53[2] | combined cycle[1] | yes[1][2][3] | 2025 (planned)[1] |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
Unit name |
---|
2-1 |
2-2 |
Background
This project was proposed in the 14th Five-Year Plan and the 2035 Vision Outline for Xingning City's national economic and social development, with the anticipated construction period being from 2020 to 2023. However, there is no relevant follow-up information available. [5]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://archive.org/details/2021-2025_202405.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 (PDF) https://web.archive.org/web/20240509014247/https://www.xingning.gov.cn/attachment/0/95/95841/2172448.pdf. Archived from the original (PDF) on 09 May 2024.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://www.xingning.gov.cn/gkmlpt/content/2/2172/post_2172448.html?jump=fals.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 https://baike.baidu.com/item/%E4%B8%9C%E8%8E%9E%E7%9F%B3%E7%A2%A3%EF%BC%88%E5%85%B4%E5%AE%81%EF%BC%89%E4%BA%A7%E4%B8%9A%E8%BD%AC%E7%A7%BB%E5%B7%A5%E4%B8%9A%E5%9B%AD%E5%88%86%E5%B8%83%E5%BC%8F%E8%83%BD%E6%BA%90%E7%AB%99/61448689?fr=aladdin.
{{cite web}}
: Missing or empty|title=
(help) - ↑ "兴宁市人民政府关于印发兴宁市国民经济和社会发展第十四个五年规划和二〇三五年远景目标纲要的通知". 2021-05-17. Retrieved 2023-10-24.
{{cite web}}
: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.