Dual Cnp solar project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Dual Cnp solar project is an operating solar photovoltaic (PV) farm in Campo Novo do Parecis, Mato Grosso, Brazil.

Project Details

Table 1: Phase-level project details for Dual Cnp solar project

Status Commissioning year Nameplate capacity Technology Owner
Operating[1] 2021[1] 2.3 MW[1] PV[1] Duarte Albuquerque Comercio e Industria LTDA (REG) [100%][1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Dual Cnp solar project

Location Coordinates (WGS 84)
Campo Novo do Parecis, Mato Grosso, Brazil[1] -13.7015, -57.9103 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://web.archive.org/web/20240125152719/https://dadosabertos.aneel.gov.br/dataset/siga-sistema-de-informacoes-de-geracao-da-aneel/resource/11ec447d-698d-4ab8-977f-b424d5deee6a. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)