Dunav wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Danube 1, Danube 2
Dunav wind farm is an announced wind farm in Veliko Gradište, Serbia.
Project Details
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Announced[1] | 10 MW[1] | Onshore[1] | Fintel Energija[1] |
2 | Announced[1] | 10 MW[1] | Onshore[1] | Fintel Energija[1] |
Location
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Veliko Gradište, Serbia[1] | 44.7452, 21.5118 (approximate)[2][1] |
2 | Veliko Gradište, Serbia[1] | 44.7452, 21.5118 (approximate)[2][1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 (PDF) https://www.fintelenergija.rs/storage/uploaded/ckfinder/files/izvestaji/2021-06-30_Quarterly%20stand-alone%20report_Fintel%20Energija%20ad.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 https://goo.gl/maps/qjoX2bKLXYXFQ7oY8.
{{cite web}}
: Missing or empty|title=
(help)