Duri-Dumai Gas Pipeline
From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
The Duri-Dumai Gas Pipeline is an operating natural gas pipeline.[1]
Location
The pipeline runs from Duri, Riau to Pertamina’s Refinery Unit II in Dumai, Riau.
Project Details
- Operator: PT Pertamina Gas[2]
- Owner: PT Pertamina Gas[2]
- Parent company: PGN (Persero) Tbk [51%]; Pertamina [49%][3]
- Capacity: 200 million cubic feet per day[4]
- Length: 67 kilometers[2]
- Diameter: 24 inches[2]
- Status: Operating[2]
- Start Year: 2018[5]
- Cost:
- Financing:
- Associated Infrastructure:
Background
The pipeline was commissioned in November 2018.[5]
Articles and resources
References
- ↑ Pertagas and PGN Embark on Construction of Duri-Dumai Gas Pipeline, Insider Network, Nov. 14, 2017
- ↑ 2.0 2.1 2.2 2.3 2.4 Master Plan for Natural Gas Transmission and Distribution 2022-2031,https://jdih.esdm.go.id/storage/document/Kepmen%20ESDM%2010.K.MG.01.MEM.M.2023%20ttg%20RIJTDGBN.pdf
- ↑ Anastasia Arvirianty. "PGN Caplok Pertagas, 9.677 Km Pipa Gas akan Tersambung". CNBC Indonesia (in Bahasa Indonesia). Retrieved 2023-08-17.
- ↑ Duri-Dumai gas pipeline begins operation The Jakarta Post, Nov. 26, 2018
- ↑ 5.0 5.1 Duri-Dumai gas pipeline to be commissioned on Nov. 4, The Jakarta Post, Oct. 29, 2018
Related GEM.wiki articles
Existing Pipelines in Indonesia