Duri Tiga power station is a 52-megawatt (MW) gas-fired power plant, which has started construction (as of June 2019), but has been delayed in the province of Riau, Indonesia.[1]

Location

The map below shows the approximate location of the power station in Duri - Kec Mandau - Kab Bengkalis, the province of Riau, Indonesia.

Loading map...

Project Details

  • Sponsor: PT Riau Energi Tiga
  • Parent company: PT Riau Energi Tiga
  • Location: Duri - Kec Mandau - Kab Bengkalis, the province of Riau, Indonesia
  • Coordinates: 1.2596, 101.2131 (approximate)
  • Gross capacity (under construction, but delayed): 52 MW
    • Combined-cycle unit: 52 MW (no start-up date)