E/One solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

E/One solar farm is a solar photovoltaic (PV) farm in pre-construction in Mount Lebanon, Baalbek-Hermel, Lebanon.

Project Details

Table 1: Phase-level project details for E/One solar farm

Status Commissioning year Nameplate capacity Technology
Pre-construction[1] 2025 (planned)[2] 15 MW[3][2] PV[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for E/One solar farm

Location Coordinates (WGS 84)
Mount Lebanon, Baalbek-Hermel, Lebanon[1] 33.8489, 35.651 (approximate)[1]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://web.archive.org/web/20240207152211/https://lcec.org.lb/our-work/MEW/solar-Farm-180. Archived from the original on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240201130115/https://www.pv-magazine.com/2022/05/13/lebanon-issues-11-solar-licenses-for-165-mw/. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. https://web.archive.org/web/20240201130325/https://www.aa.com.tr/ar/%D8%A7%D9%84%D8%AF%D9%88%D9%84-%D8%A7%D9%84%D8%B9%D8%B1%D8%A8%D9%8A%D8%A9/%D9%84%D8%A8%D9%86%D8%A7%D9%86-%D9%8A%D9%88%D9%82%D9%91%D8%B9-%D8%B9%D9%82%D9%88%D8%AF%D9%8B%D8%A7-%D9%85%D8%B9-11-%D8%B4%D8%B1%D9%83%D8%A9-%D9%84%D8%A5%D9%86%D8%AA%D8%A7%D8%AC-%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-%D9%85%D9%86-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D8%B4%D9%85%D8%B3%D9%8A%D8%A9/2890261. Archived from the original on 01 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. (PDF) https://web.archive.org/web/20240207112103/https://lcec.org.lb/sites/default/files/2021-02/Call%20for%20EOI%27s%20Solar%20Farms.pdf. Archived from the original (PDF) on 07 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)