EDF Serra Do Seridó wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

EDF Serra Do Seridó wind farm (Complexo Eólico EDF Serra do Seridó) is an operating wind farm in Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil.

Project Details

Table 1: Phase-level project details for EDF Serra Do Seridó wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
2 Construction[1] 2024 (planned)[2] 33 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[3][4] EDF Renewables (法國電力再生能源公司)[5][6]
3 Operating[1] 2023[3] 44 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[3][4] EDF Renewables (法國電力再生能源公司)[5][6]
4 Construction[1] 2024 (planned)[2] 44 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[3][4] EDF Renewables (法國電力再生能源公司)[5][6]
6 Operating[1] 2023[3] 50 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[3][4] EDF Renewables (法國電力再生能源公司)[5][6]
7 Operating[1] 2023[3] 49 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[3][4] EDF Renewables (法國電力再生能源公司)[5][6]
9 Operating[1] 2023[3] 50 MW[1] Onshore[1] EDF Renewables [100%] (法國電力再生能源公司)[3][4] EDF Renewables (法國電力再生能源公司)[5][6]

Location

Table 2: Phase-level location details for EDF Serra Do Seridó wind farm

Phase Name Location Coordinates (WGS 84)
2 Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil[1] -6.9697, -36.7591 (exact)[1]
3 Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil[1] -6.9689, -36.7932 (exact)[1]
4 Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil[1] -6.9613, -36.7859 (exact)[1]
6 Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil[1] -6.9731, -36.8014 (exact)[1]
7 Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil[1] -6.9705, -36.7457 (exact)[1]
9 Junco do Seridó, Região Metropolitana de Patos, Região Geográfica Intermediária de Campina Grande, Paraíba, Brazil[1] -7.0019, -36.8001 (exact)[1]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126154619/https://edf-re.com.br/en/our-projects/wind-projects/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 3.9 https://web.archive.org/web/20240126154716/https://renewablesnow.com/news/edf-renewables-to-build-242-mw-wind-park-in-brazil-739516/. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20211106110445/https://www.aneel.gov.br/sala-de-imprensa-exibicao-2/-/asset_publisher/zXQREz8EVlZ6/content/aneel-homologa-mais-de-58-empreendimentos-do-leilao-a-6-de-2019/656877/pop_up?_101_INSTANCE_zXQREz8EVlZ6_viewMode=print&_101_INSTANCE_zXQREz8EVlZ6_languageId=pt_BR. Archived from the original on 06 November 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 https://web.archive.org/web/20240130223308/https://www.canalenergia.com.br/noticias/53133024/parque-eolico-e-aprovado-como-projeto-prioritario-no-serido-paraibano. Archived from the original on 30 January 2024. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://web.archive.org/web/20240130223534/https://edf-re.com.br/nossos-projetos/eolicos/. Archived from the original on 30 January 2024. {{cite web}}: Missing or empty |title= (help)