ERNC Antofagasta hybrid wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: ERNC Antofagasta
ERNC Antofagasta hybrid wind farm (ERNC Antofagasta) is a wind farm in pre-construction in Taltal, Antofgasta, Antofagasta, Chile.
Project Details
Table 1: Phase-level project details for ERNC Antofagasta hybrid wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner |
---|---|---|---|---|---|
1 | Pre-construction[1] | 2025 (planned)[1] | 145.2 MW[1] | Onshore[1] | Grupo Ibereólica Renovables[1] |
2 | Pre-construction[1] | 2027 (planned)[1] | 382.8 MW[1] | Onshore[1] | Grupo Ibereólica Renovables[1] |
Location
Table 2: Phase-level location details for ERNC Antofagasta hybrid wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Taltal, Antofgasta, Antofagasta, Chile[1] | -25.2495, -69.8671 (approximate)[1] |
2 | Taltal, Antofgasta, Antofagasta, Chile[1] | -25.2495, -69.8671 (approximate)[1] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References