EV1 wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
EV1 wind farm (Parque Eólico EV1) is a wind farm in pre-construction in Touros , Rio Grande do Norte, Brazil.
Project Details
Table 1: Phase-level project details for EV1 wind farm
Phase name | Status | Nameplate capacity | Type | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 31.5 MW[1] | Onshore[2] | Eolica Esquina Do Vento SPE [100%][2] |
2 | Pre-construction[1] | 31.5 MW[1] | Onshore[2] | Eolica Esquina Do Vento SPE [100%][2] |
Location
Table 2: Phase-level location details for EV1 wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Touros , Rio Grande do Norte, Brazil[1] | -5.2664, -35.5075 (exact)[1] |
2 | Touros , Rio Grande do Norte, Brazil[1] | -5.2746, -35.5262 (exact)[1] |
The map below shows the exact locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 Agência Nacional de Energia Elétrica - ANEEL (2024-02-10). "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. Retrieved 2024-09-18.
{{cite web}}
: Check|archive-url=
value (help) - ↑ 2.0 2.1 2.2 2.3 https://web.archive.org/web/20220309212208/https://www.aneel.gov.br/siga. Archived from the original on 09 March 2022.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help)