Belogorsk-Khabarovsk Gas Pipeline
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Belogorsk-Khabarovsk Gas Pipeline (also known as Phase I of Eastern Gas Supply System and Svobodny–Khabarovsk Gas Pipeline; Russian: Газопровод "Белогорск-Хабаровск") is a proposed gas pipeline in Russia.[1]
Location
The pipeline is proposed to run from the Amur Gas Processing Plant near Svobodny, Amur region, to Khabarovsk, Khabarovsk Krai, Russia.[1][2]
Project details
- Operator: Gazprom[2]
- Owner: Gazprom[2]
- Parent company: Gazprom
- Capacity: 28 bcm/y[2]
- Length: 830 km[2]
- Diameter:
- Status: Construction[3]
- Construction year: 2024[3]
- Start year: 2029[2]
- Cost:
- Financing:
- Associated infrastructure: Power of Siberia Gas Pipeline, Sakhalin-Khabarovsk-Vladivostok Gas Pipeline
Background
The pipeline was mentioned as a proposed pipeline in Gazprom's 2020 map for its Unified Gas Supply System.[4][1] The route appears to be an updated version of an expansion of the Power of Siberia Gas Pipeline, which is considered cancelled given no progress since its proposal in 2015. This pipeline, if built, will be an important connector in Gazprom's Eastern Gas Program, linking the Power of Siberia Gas Pipeline with the Sakhalin-Khabarovsk-Vladivostok Gas Pipeline in Russia's Far East.[5]
In 2022, the project was mentioned in the media under the name of "Eastern Gas Supply System".[6] In October 2022, it was reported that collection of initial data and engineering surveys had been launched.[7] The construction is expected to be completed in 2029.[6] The Gazprom's 2022 Annual Report lists the pipeline under "Prospective/Under Construction Projects".[8] In March 2023, Russian Energy Minister Nikolay Shulginov said that the Sakhalin–Khabarovsk–Vladivostok pipeline and the Power of Siberia pipeline might be connected in the future in the area of Khabarovsk.[9]
In January 2024, project and survey work was in progress for the construction of the Belogorsk-Khabarovsk Gas Pipeline (referred to as "Phase I" of the "Eastern Gas Supply System" project).[2][3] The pipeline will span approximately 830 km from the Amur Gas Processing Plant to its connection with the Sakhalin-Khabarovsk-Vladivostok gas pipeline system near Khabarovsk. In March 2024, it was reported that the construction had begun. This pipeline will link the Yakutsk and Sakhalin production centers, enhancing the reliability of gas supply throughout the region.[3] The completion of construction is planned for 2029, however, Gazprom and the Russian Ministry of Energy are working on accelerating the construction of the pipeline.[10]
Articles and resources
References
- ↑ 1.0 1.1 1.2 "Gazprom Development Map 2020". Archived from the original on 2021-12-13. Retrieved 2021-12-13.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 "Восточная система газоснабжения". neftegaz.ru. April 24, 2024. Retrieved July 1, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 3.0 3.1 3.2 3.3 ""Газпром" начинает мега-проект "Восточная система газоснабжения" длиной более 5000 км". Interfax. March 21, 2024. Retrieved July 1, 2024.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Transmission". www.gazprom.com. Retrieved 2021-12-14.
- ↑ "Eastern Gas Program". www.gazprom.com. Retrieved 2021-12-14.
- ↑ 6.0 6.1 "Новый 800-километровый газопровод построят от Хабаровска до Амурской области". prokhab.ru. October 27, 2022. Retrieved July 19, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Новый трубопровод построят в Амурскую область". EastRussia. October 28, 2022. Retrieved July 19, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "ГОДОВОЙ ОТЧЕТ ПАО «ГАЗПРОМ» ЗА 2022 ГОД" (PDF). Газпром добыча Краснодар. June 30, 2023. Retrieved July 19, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Минэнерго ускорит газификацию Сибири и Дальнего Востока". Ведомости. March 16, 2023. Retrieved July 19, 2023.
{{cite web}}
: CS1 maint: url-status (link) - ↑ "Особенности и проблемы пространственного развития восточной газотранспортной системы России". Энергетическая политика. June 16, 2024. Retrieved July 3, 2024.
{{cite web}}
: CS1 maint: url-status (link)