Eastern Gulf Crude Access Pipeline Project (EGCAP)

From Global Energy Monitor
Part of the
Global Oil Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Eastern Gulf Crude Access Pipeline Project (EGCAP), also known as the Patoka St. James Oil Pipeline and the Trunkline Reversal, was a proposed oil pipeline in the United States.[1] There have been no updates since 2013, and the project is presumed to be cancelled as of 2017.

Location

The pipeline was proposed to run from Patoka, Illinois, to St. James, Louisiana.

Loading map...

Project details

  • Operator:
  • Owner: Energy Transfer Partners, Enbridge[2]
  • Parent company: Energy Transfer Partners, Enbridge[2]
  • Capacity: 420,000 barrels per day (bpd)
  • Length: 1127 kilometers
  • Status: Cancelled
  • Start year:

Background

The Eastern Gulf Crude Access Project (EGCAP) was a proposed 420,000 bpd crude oil pipeline proposed by Energy Transfer Partners and Enbridge. It would run from the Patoka Oil Terminal Hub directly to refinery markets along the Mississippi River and the Louisiana Gulf Coast, including to the crude oil terminal hub in St. James, Louisiana (the St. James Hub). It would use 575 miles of the underutilized Trunkline Gas Pipeline.[1]

The project was announced in June 2013. In November 2013, Energy Transfer Partners revealed that the proposal had not received enough shipper interest to proceed with building the final leg of the project – a 160-mile lateral pipeline from Boyce to St. James, Louisiana. That final link to St. James would have provided direct pipeline access for the proposed Dakota Express Oil Pipeline, for shippers from North Dakota to Mississippi River and Louisiana Gulf Coast refineries. Energy Transfer is now considering terminating the EGCAP pipeline at the Nederland Terminal close to Port Arthur, Texas. Also in November 2013 Energy Transfer’s memorandum of understanding with Enbridge to jointly finance EGCAP expired.[3]

As of 2017 the project has not moved forward.

Articles and resources

References

  1. 1.0 1.1 Eastern Gulf Crude Access Pipeline Project (EGCAP), A Barrel Full, accessed September 2017
  2. 2.0 2.1 "ENERGY TRANSFER COMMENCES OPEN SEASON PERIOD FOR THE EASTERN GULF CRUDE ACCESS PIPELINE". Energy Transfer Partners. Retrieved 2022-04-11.{{cite web}}: CS1 maint: url-status (link)
  3. "The Night They Drove Old Dakota Express Down – Crude Pipeline Wars in the Bakken – Part 2," RBN Energy, 3/4/2014

Related GEM.wiki articles

External resources

External articles