Ecosolar solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Ecosolar solar farm (Parque Solar Ecosolar) is an operating solar photovoltaic (PV) farm in Distrito Barú, Chiriquí, Panama.
Project Details
Table 1: Phase-level project details for Ecosolar solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|---|
1 | Operating[1] | 2021[1] | 10 MWp/dc[1] | PV[1] | Photovoltaics Business CORP[1] |
2 | Operating[1] | 2021[1] | 10 MWp/dc[1] | PV[1] | Photovoltaics Business CORP[1] |
3 | Construction[2] | 2025 (planned)[2] | 10 MWp/dc[3] | PV[3] | Photovoltaics Business CORP[3] |
4 | Construction[2] | 2025 (planned)[2] | 10 MWp/dc[3] | PV[3] | Photovoltaics Business CORP[3] |
5 | Construction[2] | 2025 (planned)[2] | 10 MWp/dc[3] | PV[3] | Photovoltaics Business CORP[3] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Ecosolar solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Distrito Barú, Chiriquí, Panama[4] | 8.4429, -82.8376 (approximate)[4] |
2 | Distrito Barú, Chiriquí, Panama[4] | 8.4429, -82.8376 (approximate)[4] |
3 | Distrito Barú, Chiriquí, Panama[4] | 8.4429, -82.8376 (approximate)[4] |
4 | Distrito Barú, Chiriquí, Panama[4] | 8.4429, -82.8376 (approximate)[4] |
5 | Distrito Barú, Chiriquí, Panama[4] | 8.4429, -82.8376 (approximate)[4] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 (PDF) https://web.archive.org/web/20240125174022/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2022/licencias_operacion_jul29.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 (PDF) https://web.archive.org/web/20240126160505/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2023/listado_licencias_may30.pdf. Archived from the original (PDF) on 26 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 (PDF) https://web.archive.org/web/20240125174153/https://www.asep.gob.pa/wp-content/uploads/electricidad/concesiones_licencias/concesiones_licencias/2022/listado_licencias_jul29.pdf. Archived from the original (PDF) on 25 January 2024.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 4.9 https://goo.gl/maps/q62Vk6UoEJQGYfx99.
{{cite web}}
: Missing or empty|title=
(help)