Ecowende Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Hollandse Kust (west) lot VI, HKW Wind Farm Site VI (Phase 1), Hollandse Kust (West) wind farm, Hollandse Kust West Vi, Hollandse Kust (west) Wind Farm Zone (HKWWFZ)

Ecowende Offshore wind farm is a wind farm in pre-construction in Netherlands.

Project Details

Table 1: Phase-level project details for Ecowende Offshore wind farm

Status Commissioning year Nameplate capacity Type Owner
Pre-construction[1] 2026 (planned)[2][3] 780 MW[2] Offshore hard mount[3] TenneT TSO BV; Shell Wind Energy Ltd; Eneco NV[4][4][4]

Location

Table 2: Phase-level location details for Ecowende Offshore wind farm

Location Coordinates (WGS 84)
Netherlands[2] 52.4602611340179, 4.483609936100088 (approximate)[2]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://ecowende.nl/en/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://ecowende.nl/en/our-wind-farm/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://ocean-energyresources.com/2024/02/02/sale-of-stake-in-ecowende/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240219050708/https://www.4coffshore.com/windfarms/netherlands/ecowende-netherlands-nl0o.html. Archived from the original on 19 February 2024. {{cite web}}: Missing or empty |title= (help)