Ecowind wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Ecowind wind farm is a wind farm in pre-construction in Balykchy, Issyk-Kul, Kyrgyzstan.

Project Details

Table 1: Phase-level project details for Ecowind wind farm

Status Nameplate capacity Type Owner
Pre-construction[1][2] 200 MW[3] Onshore[3] Kyrgyz Wind System JSC [100%] (ОАО "Кыргыз винд систем")[2]

Location

Table 2: Phase-level location details for Ecowind wind farm

Location Coordinates (WGS 84)
Balykchy, Issyk-Kul, Kyrgyzstan[3] 42.4625, 76.1901 (approximate)[3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. https://web.archive.org/web/20240126125702/https://kaktus.media/doc/477047_kogda_stroit_bydem_grandioznye_i_ne_ochen_energeticheskie_proekty_kotorye_nam_obeshali.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240126125750/https://www.vb.kg/doc/422734_perehodim_na_zelenyu:_chto_meshaet_razvitiu_energii_stihiy_v_kyrgyzstane.html. Archived from the original on 26 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 https://web.archive.org/web/20240125190425/https://www.linkedin.com/pulse/first-wind-project-being-realised-kyrgyzstan-country-?trk=organization-update-content_share-article. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)