El Tesorito power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

El Tesorito power station (Central Termotesorito) is an operating power station of at least 209-megawatts (MW) in San Antonio Sahagún, Córdoba, Colombia. It is also known as Central termoeléctrica El Tesorito.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
El Tesorito power station San Antonio Sahagún, Córdoba, Colombia 8.646644, -75.45943 (approximate)[1][2]

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
1 Operating[3][4][5] fossil gas: natural gas[6][2] 209[7][6][8] internal combustion[6][2] not found 2022[3][4][9]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Celsia Colombia SAESP [100%][3][4] Celsia Colombia SAESP [100.0%]

Background

The 200 MW El Tesorito power station began commercial operations in September 2022[10][11], becoming the largest new natural gas-fired power station to be built in Colombia in recent years.[11] The plant is powered by 11 small Wärtsilä engines, each with a capacity of approximately 19 MW.[10] The plant does not appear in Global Energy Monitor's Global Gas Plant Tracker due to the tracker's minimum threshold capacity of 50 MW per generating unit.[12]

Celsia and Wärtsilä Finland OY were responsible for the construction of the El Tesorito power station.[13] As of March 2021, Celsia posted a Youtube video indicating that the substation was being built primarily by locals.

Articles and Resources

References

  1. https://web.archive.org/web/20240125140337/https://www.google.com/maps/place/Termoel%C3%A9ctrica+El+Tesorito+%7C+San+Ant%C3%B3nio/@8.6596135,-75.4652773,3156m/data=!3m1!1e3!4m6!3m5!1s0x8e5bc505d23108f1:0xde812281f65d41a5!8m2!3d8.6465252!4d-75.4594465!16s%2Fg%2F11s_z1_xtc?entry=tts. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 (PDF) https://web.archive.org/web/20240125132611/https://www.celsia.com/wp-content/uploads/2021/06/LICENCIA_AMBIENTAL-LAV0018_-ElTesorito-pag1-y-170.pdf. Archived from the original (PDF) on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240125105437/https://www.elcolombiano.com/negocios/este-sabado-arranca-la-operacion-termotesorito-BJ18557327. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 https://web.archive.org/web/20240125115025/https://www.celsia.com/es/centrales-termicas/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20230609065147/https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx. Archived from the original on 09 June 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. 6.0 6.1 6.2 https://web.archive.org/web/20240125101531/https://www.wartsila.com/media/news/08-03-2021-wartsila-s-200-mw-power-plant-to-provide-critical-grid-balancing-and-back-up-power-to-the-national-grid-in-colombia-2874182. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://web.archive.org/web/20240125133721/https://www1.upme.gov.co/siel. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. https://web.archive.org/web/20240125101611/https://ennuestrocampo.co/tesorito-empieza-a-generar-energia-para-colombia/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. https://web.archive.org/web/20240125135141/https://hablemosdemineria.com/2022/09/una-nueva-planta-termoelectrica-entra-funcionamiento-colombia/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 "Tesorito empieza a generar energía para Colombia - En nuestro campo". En Nuestro Campo. September 3, 2022.
  11. 11.0 11.1 "Una nueva planta prendió motores para generar energía con gas natural en Colombia". Semana. September 16, 2022.{{cite web}}: CS1 maint: url-status (link)
  12. "Global Gas Plant Tracker Methodology". Global Energy Monitor. Retrieved 2022-11-13.{{cite web}}: CS1 maint: url-status (link)
  13. Semana (2021-01-21). "Celsia Colombia garantizará obligaciones de filial por más de 40 millones de euros". Semana.com Últimas Noticias de Colombia y el Mundo (in español). Retrieved 2021-06-22.

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.